Shanxi Tongde Xinghua Special Steel Co Ltd (大同煤矿天建钢铁有限公司, 山西同德兴华特钢有限公司), also known as Datong Coal Mine Tianjian Iron and Steel Co., Ltd., is a steel plant in Gudian, Nanjiao, Datong, Shanxi, China that operates basic oxygen furnace (BOF) and blast furnace (BF) technology.
Location
The map below shows the exact location of the plant in Gudian, Nanjiao, Datong, Shanxi, China:
Location:
Coordinates (WGS 84 ): 40.183517, 113.305462 (exact)
Background
The company is suspected of concealing a safety incident involving three individuals.[ 1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
State-owned entity status
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Partial
Shanxi State-Owned Capital Investment and Operation Co Ltd [28.7%]; Datong Qijun Trading Co Ltd [26.0%]; Tianjin Bohai Runde Steel Group Co Ltd [25.0%]; China Cinda Asset Management Co Ltd [14.8%]; Jinneng Holding Group Co Ltd [3.2%]; unknown [2.3%]; Jinneng Group Co Ltd
unknown [28.7%]; unknown [26.0%]; unknown [25.0%]; unknown [14.8%]; unknown [3.2%]; not applicable [2.3%]; unknown
E100000001663 [28.7%]; E100000128383 [26.0%]; E100000128384 [25.0%]; E100000123329 [14.8%]; E100000001543 [3.2%]; E100000132388 [2.3%]; E100000001542
Shanxi Tongde Xinghua Special Steel Co Ltd [100%][ 3]
unknown
E100000127073 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Nominal crude steel capacity (total)
operating
2500[ 4]
2500[ 4]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Nominal iron capacity (total)
operating
1100[ 6]
1100[ 6]
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel
Sinter
Coke
Pellets
NF
NF
NF
NF
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
BOF production
Other/unknown steel production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
BF production
Other/unknown iron production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Current size
Current capacity (ttpa)
Decarbonization technology
unknown BF (1)
operating[ 7]
450.0 m3[ 7]
550[ 6]
unknown
unknown BF (2)
operating[ 7]
450.0 m3[ 7]
550[ 6]
unknown
Table 10: Basic Oxygen Furnace Details
Unit name
Status
Current capacity (ttpa)
Current size
unknown BOF (1)
operating[ 3]
1250[ 4]
35.0 tonnes[ 7]
unknown BOF (2)
operating[ 3]
1250[ 4]
35.0 tonnes[ 7]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources