Shri Bajrang Power & Ispat Tilda steel plant , also known as SBPIL, is a steel plant in Tilda, Tandwa, Raipur, Chhattisgarh, India that operates steelmaking, basic oxygen furnace (BOF), blast furnace (BF), and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Tilda, Tandwa, Raipur, Chhattisgarh, India:
Location: Kh. No. 521/44, Village- Tandwa, Dharsiwa-Tilda Road, Tehsil- Tilda, Raipur (C.G.), 493116
Coordinates (WGS 84 ): 21.48619, 81.771697 (exact)
Background
SBPIL obtained environmental Clearance for setting up an Integrated Steel Plant at Tilda, in October 6th, 2010.[ 1] The plant began operation in 2013 with a capacity of 500 ttpa.[ 2] In 2021, the company later announced their plans to expand the capacity by another 500 ttpa.[ 1] In 2022, the company sought environmental clearance for the expansion project.[ 3]
In August 2025, the Expert Appraisal Committee (EAC) deferred the expansion project for various reasons, including unclear land demarcation, hydrological concerns, greenbelt and plantation gaps, etc. A sub-committee plans to conduct a site visit to examine the concerns and fund appraisal will follow based on their findings.[ 4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Announced date
Start date
Power source
Iron ore source
Coal source
2010[ 5]
2013[ 6]
100 MW Captive Power Plant[ 5]
unknown
South Eastern Coal Field Limited[ 7]
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Banka Finance & Securities Pvt Ltd [15.9%]; Atlanta Securities Pvt Ltd [15.6%]; Bonus Dealcom Pvt Ltd [5.5%]; Sukanya Merchandise Pvt Ltd [5.5%]; natural person(s)
unknown [15.9%]; 5035517336 [15.6%]; 5085422296 [5.5%]; unknown [5.5%]; not applicable
E100001012215 [15.9%]; E100001012216 [15.6%]; E100001012219 [5.5%]; E100001012218 [5.5%]; E100000123261
Shri Bajrang Power and Ispat Ltd [100%][ 8]
4298361778
E100001012214 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Other/unspecified steelmaking capacity
Nominal crude steel capacity (total)
announced
1100[ 9]
–
1100[ 9]
operating
–
500[ 5]
500[ 5]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Sponge iron/DRI capacity
Nominal iron capacity (total)
announced
1130[ 9] [ 5]
330[ 9]
1460[ 9] [ 5]
operating
–
600[ 5]
600[ 5]
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
Other/unknown steel production
2019
unknown
2020
unknown
2021
unknown
2022
unknown
2023
unknown
2024
unknown
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
DRI production
2019
unknown
2020
unknown
2021
unknown
2022
unknown
2023
unknown
2024
unknown
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Announced date
Current size
Current capacity (ttpa)
Decarbonization technology
unknown BF (1)
announced[ 5]
2010[ 5]
–
550[ 5]
unknown
unknown BF (2)
announced[ 9]
2021[ 9]
550.0[ 9]
580[ 9] [ 5]
–
Table 10: Direct Reduced Iron Furnace Details
Unit name
Status
Announced date
Start date
Furnace type
Current capacity (ttpa)
unknown DRI (1)
operating[ 5]
2010[ 5]
2013[ 6] [ 10]
rotary kiln[ 6]
150[ 5]
unknown DRI (2)
operating[ 5]
2010[ 5]
2018[ 6]
rotary kiln[ 6]
150[ 5]
unknown DRI (3)
operating[ 5]
2010[ 5]
–
rotary kiln[ 6]
150[ 5]
unknown DRI (4)
operating[ 5]
2010[ 5]
–
rotary kiln[ 6]
150[ 5]
unknown DRI (5)
announced[ 9]
2021-10[ 9]
–
rotary kiln[ 9]
165[ 9]
unknown DRI (6)
announced[ 9]
2021-10[ 9]
–
rotary kiln[ 9]
165[ 9]
Table 11: Direct Reduced Iron Furnace Reductant Details
Unit name
Current or initial reductant
Current or initial hydrogen reductant color
Hydrogen reductant status
Future hydrogen reductant color
unknown DRI (1)
coal (solid)[ 6]
not found
unknown
not found
unknown DRI (2)
coal (solid)[ 6]
not found
unknown
–
unknown DRI (3)
coal (solid)[ 6]
not found
unknown
not found
unknown DRI (4)
coal (solid)[ 6]
not found
unknown
not found
unknown DRI (5)
coal (solid)[ 9]
not found
unknown
not found
unknown DRI (6)
coal (solid)[ 9]
not found
unknown
–
Table 12: Basic Oxygen Furnace Details
Unit name
Status
Announced date
Current capacity (ttpa)
Current size
unknown BOF (1)
announced[ 5]
2021-10[ 9]
550[ 9]
65.0 tonnes[ 9]
unknown BOF (2)
announced[ 9]
2021-10[ 9]
550[ 9]
65.0 tonnes[ 9]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources