Shyam Steel Raghunathpur steel plant, also known as JSK-II, Shyam Steel Purulia, is a steel plant in Raghunathpur, Purulia, West Bengal, India that operates blast furnace (BF), induction furnace (IF), basic oxygen furnace (BOF), electric arc furnace (EAF), and direct reduced iron (DRI) technology.
Location
The map below shows the approximate location of the plant in Raghunathpur, Purulia, West Bengal, India:
- Location: Raghunathpur Steel & Allied Industrial Park-II, Mouza - Lachhmanpur, Jarukhamar, Siulibari, Digardhi, Shikratyar, Senera Block – Raghunathpur-I, District- Purulia, West Bengal, India
- Coordinates (WGS 84): 23.590212, 86.724603 (approximate)
Background
Shyam Steel Limited proposed to constructed an integrated steel plant in Raghunathpur, Purulia, West Bengal at an investment of around INR 3,445 crore.[1] An Integrated steel plant with a capacity of 1.1 mtpa was proposed at the site which obtained environmental clearance in 2010.[2] The project was abandoned in 2013[3], however, it was later modified with a new proposal in 2021.[4] The project was modified further in 2022.[5] The project is expected to be developed in three phases. Phase-I involves setting up of two DRI units of total capacity 420 ttpa and six induction furnaces of 420 ttpa total capacity. Phase-II involves the installation of four more DRI units of capacity 840 ttpa and six more induction furnaces of capacity 420 ttpa. Phase-III involves addition of an electric arc furnace of capacity 175 ttpa, a 750 m3 blast furnace, a basic oxygen furnace of 525 ttpa and other auxiliary facilities.[6] Phase- I began operation in February 2024.[7]
As of October 2025, there hasn't been any updates on the development of the plant.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Start date | Workforce size | Power source | Iron ore source | Coal source |
|---|---|---|---|---|---|
| 2021[8] | 2024[9] | 8000[10] | 57.5 MW WHRB from DRI and Coke Oven; 15 MW CFBC Boiler[11] | Odisha, Jharkhand, Chhattisgarh[12] | Jharkhand, Odisha, West Bengal, and Imprted[12] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Shyam Steel Industries Ltd [100.0%] | 4298177772 [100.0%] | E100000130859 [100.0%] | Shyam Steel Industries Ltd [100%][13] | 4298177772 | E100000130859 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Main production equipment |
|---|---|---|
| semi-finished[10] | angle, bar[10] | BF; IF; DRI; BOF; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Induction furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|---|
| announced | 525[11] | 175[14] | 840[15][10] | 1540[14][11][15][10] |
| operating | – | – | 420[10] | 420[10] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|---|
| announced | 788[11] | 1260[10] | 2048[11][10] |
| operating | – | 420[10] | 420[10] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Coke | Pellets |
|---|---|---|
| 1092[12] | 500[12] | 1200[15] |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production |
|---|---|
| 2024 | unknown |
Unit Details
Table 8: Blast Furnace Details
| Unit name | Status | Announced date | Current size | Current capacity (ttpa) | Decarbonization technology |
|---|---|---|---|---|---|
| unknown BF (1) | announced[10] | 2021[8] | 750.0 m3[11][12] | 788[11] | unknown |
Table 9: Direct Reduced Iron Furnace Details
| Unit name | Status | Announced date | Start date | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|
| unknown DRI (1) | operating[9] | 2021[8] | 2024[9] | rotary kiln[10] | 210[10] |
| unknown DRI (2) | operating[9] | 2021[10] | 2024[9] | rotary kiln[10] | 210[10] |
| unknown DRI (3) | announced[10] | 2021[10] | – | rotary kiln[10] | 210[10] |
| unknown DRI (4) | announced[10] | 2021[10] | – | rotary kiln[10] | 210[10] |
| unknown DRI (5) | announced[10] | 2021[10] | – | rotary kiln[10] | 210[10] |
| unknown DRI (6) | announced[10] | 2021[10] | – | rotary kiln[10] | 210[10] |
| unknown DRI (7) | announced[10] | 2021[10] | – | rotary kiln[10] | 210[10] |
| unknown DRI (8) | announced[10] | 2021[10] | – | rotary kiln[10] | 210[10] |
Table 10: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant | Hydrogen reductant status |
|---|---|---|
| unknown DRI (1) | coal (solid)[10] | unknown |
| unknown DRI (2) | coal (solid)[10] | unknown |
| unknown DRI (3) | coal (solid)[10] | unknown |
| unknown DRI (4) | coal (solid)[10] | unknown |
| unknown DRI (5) | coal (solid)[10] | unknown |
| unknown DRI (6) | coal (solid)[10] | unknown |
| unknown DRI (7) | coal (solid)[10] | unknown |
| unknown DRI (8) | coal (solid)[10] | unknown |
Table 11: Electric Arc Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|
| unknown EAF (1) | announced[14] | 2021[8] | 175[14] | 50.0[16][11] |
Table 12: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI |
|---|---|---|---|
| unknown EAF (1) | yes[10] | 10.71[10] | 89.29[10] |
Table 13: Basic Oxygen Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|
| unknown BOF (1) | announced[14] | 2021[11] | 525[11] | 50.0 tonnes[16][11] |
Table 14: Induction Furnace Details
| Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|---|
| unknown IF (1) | operating[9] | 2021[8] | 2024[9] | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (10) | announced[10] | 2021[8] | – | 70[15] | 20.0 tonnes[16][11] |
| unknown IF (11) | announced[10] | 2021[8] | – | 70[15] | 20.0 tonnes[16][11] |
| unknown IF (12) | announced[10] | 2021[8] | – | 70[15] | 20.0 tonnes[16][11] |
| unknown IF (13) | announced[14] | 2021[11] | – | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (14) | announced[14] | 2021[11] | – | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (15) | announced[14] | 2021[11] | – | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (16) | announced[14] | 2021[11] | – | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (17) | announced[14] | 2021[11] | – | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (18) | announced[14] | 2021[11] | – | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (2) | operating[9] | 2021[8] | 2024[9] | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (3) | operating[9] | 2021[8] | 2024[9] | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (4) | operating[9] | 2021[8] | 2024[9] | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (5) | operating[9] | 2021[8] | 2024[9] | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (6) | operating[9] | 2021[8] | 2024[9] | 70[10] | 20.0 tonnes[16][11] |
| unknown IF (7) | announced[10] | 2021[8] | – | 70[15] | 20.0 tonnes[16][11] |
| unknown IF (8) | announced[10] | 2021[8] | – | 70[15] | 20.0 tonnes[16][11] |
| unknown IF (9) | announced[10] | 2021[8] | – | 70[15] | 20.0 tonnes[16][11] |
Table 15: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % basic/merchant pig iron |
|---|---|---|---|---|
| unknown IF (1) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (10) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (11) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (12) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (13) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (14) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (15) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (16) | yes[16] | 2.00 | 83.00[16] | 15.00[16] |
| unknown IF (17) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (18) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (2) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (3) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (4) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (5) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (6) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (7) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (8) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
| unknown IF (9) | yes[16] | 2.00[16] | 83.00[16] | 15.00[16] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs named:0 - ↑ "Environmental Clearance". MoEF&CC. 05 January, 2010. Retrieved 08 January, 2024.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link) - ↑ Basak, Probal (2013-01-20). "Shyam Steel abandons Raghunathpur project". Business Standard. Retrieved 2024-12-10.
- ↑ "Environmental Clearance application". MoEF&CC. 01 June 2021. Retrieved 08 January, 2024.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link) - ↑ "Environmental Clearance" (PDF). Shyam Steel. 25 November, 2023. Retrieved 07 March 2024.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link) - ↑ "Environment Clearance Documentation". Parivesh. Retrieved 07 March 2024.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "Mamata Banerjee inaugurates Shyam Steel's Rs 1500-cr plant in Purulia". The Economic Times. 2024-02-27. ISSN 0013-0389. Retrieved 2024-03-07.
- ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 https://web.archive.org/web/20240111021035/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=5kxXGvcBx0F4EDeYLWou32lb5solsUD1b4YskBkF6TFz4hlAHoQpQeLkExU9iBcxbIAViYvCToh4DcvpL+iqh4lvdnmYc0pB4f%2FQsvCx1q7cEGxiMwi1nZJgLQwlooWkf1hWnwxUCEiaZTThPrFG%2FQ==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3p%2F41fTQPSrCxchmj8kKGKfA==. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 https://web.archive.org/web/20240312002522/https://economictimes.indiatimes.com/industry/indl-goods/svs/steel/mamata-banerjee-inaugurates-shyam-steels-rs-1500-cr-plant-in-purulia/articleshow/108043933.cms?from=mdr. Archived from the original on 2024-03-12.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 10.17 10.18 10.19 10.20 10.21 10.22 10.23 10.24 10.25 10.26 10.27 10.28 10.29 10.30 10.31 10.32 10.33 10.34 10.35 10.36 10.37 10.38 10.39 10.40 10.41 10.42 10.43 10.44 10.45 10.46 10.47 10.48 10.49 10.50 10.51 10.52 10.53 10.54 10.55 10.56 10.57 10.58 10.59 10.60 10.61 10.62 10.63 10.64 10.65 10.66 10.67 10.68 10.69 https://web.archive.org/web/20240111025707/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=5kxXGvcBx0F4EDeYLWou32lb5solsUD1b4YskBkF6TFCcByCKtses40gBgQHfy2p4YhcNaysM94VgDoiKnUffac2w553fIxGyaX2iSs%2FoGrfKFE7yTg3cA2wSkI8FpFm2YKWvM1gSU1SeNTddOEOoA==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 11.18 11.19 11.20 11.21 11.22 11.23 11.24 11.25 11.26 11.27 11.28 11.29 11.30 11.31 11.32 11.33 11.34 (PDF) https://web.archive.org/web/20240309035454/https://shyamsteel.com/wp-content/uploads/2024/01/SSWPL-EC-COMPLIANCE.pdf. Archived from the original (PDF) on 2024-03-09.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 12.2 12.3 12.4 (PDF) https://shyamsteel.com/wp-content/uploads/2024/06/EC-COMPLIANCE-SSWPL_25.05.2024_compressed-2.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240111011143/https://environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA%2FWB%2FIND%2F213283%2F2021&pid=New. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 (PDF) https://web.archive.org/web/20240309035407/https://shyamsteel.com/wp-content/uploads/2023/04/EC-SSWPL-28.02.2023.pdf. Archived from the original (PDF) on 2024-03-09.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 15.6 15.7 15.8 https://web.archive.org/web/20240111030321/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=kH7wGRU7KptYglccm272HC9BvqEnzvJPCVxUouc7aHW1BSkAKPelhzaAu7Pjktdqwro9N15uToQ%2FA3%2FCLBdfkrAZlfLpXSGskuqA8Rvkp2QFlSMVePtBcGDQtP0f8DBQ&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 16.11 16.12 16.13 16.14 16.15 16.16 16.17 16.18 16.19 16.20 16.21 16.22 16.23 16.24 16.25 16.26 16.27 16.28 16.29 16.30 16.31 16.32 16.33 16.34 16.35 16.36 16.37 16.38 16.39 16.40 16.41 16.42 16.43 16.44 16.45 16.46 16.47 16.48 16.49 16.50 16.51 16.52 16.53 16.54 16.55 16.56 16.57 16.58 16.59 16.60 16.61 16.62 16.63 16.64 16.65 16.66 16.67 16.68 16.69 16.70 16.71 16.72 16.73 16.74 16.75 16.76 16.77 16.78 16.79 16.80 16.81 16.82 16.83 16.84 16.85 16.86 16.87 16.88 16.89 16.90 https://web.archive.org/web/20240309035630/https://parivesh.nic.in/newupgrade/. Archived from the original on 2024-03-09.