Search results
From Global Energy Monitor
- Mukuyu Oil and Gas Field (Zimbabwe) (category Oil and gas extraction in Zimbabwe) (section Table 1: Field-level project details for Mukuyu Oil and Gas Field)Mukuyu Oil and Gas Field is a discovered oil and gas field in Zimbabwe. Mukuyu is a part of the Cabora Bassa complex. The map below shows the approximate4 KB (258 words) - 21:14, 20 March 2024
- Arandis Erongo power station (category Oil & Gas power stations in Namibia) (section Table 3: Unit-level ownership and operator details)stations, downloadable datases, and summary data, please visit the Global Coal Plant Tracker and the Global Oil and Gas Plant Tracker on the Global Energy5 KB (475 words) - 20:15, 11 May 2024
- Mutare Peaking power station (category Oil & Gas power stations in Zimbabwe) (section Table 3: Unit-level ownership and operator details)including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global4 KB (371 words) - 23:34, 11 May 2024
- Zimasco power plant (category Oil & Gas power stations in Zimbabwe) (section Table 3: Unit-level ownership and operator details)including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global4 KB (364 words) - 01:53, 12 May 2024
- Cabora Bassa power station (category Oil & Gas power stations in Zimbabwe) (section Table 3: Unit-level ownership and operator details)Australian oil and gas company signed a non-binding memorandum of understanding (MOU) alongside its partner, One-Gas Resources, and the power plant developer7 KB (597 words) - 20:43, 11 May 2024
- Energy Monitor website. CHP = Combined Heat and Power "Zimbabwe: Pilot Gas Production to Start in 2024". March 22, 2022. Archived from the original on3 KB (225 words) - 17:13, 28 February 2023
- Calculated for Global Oil and Gas Plant Tracker The Global Oil and Gas Plant Tracker assumes the median lifecycle emissions as reported in the IPCC 5th Assessment28 KB (989 words) - 18:13, 22 April 2024
- 600-megawatt (MW) gas-fired power plant in Cross River State, Nigeria. As of December 2019, the project has not progressed in more than four years and appears to1 KB (233 words) - 22:44, 18 March 2022