Surjagad Ispat Gadchiroli steel plant is a steel plant in Aheri, Wadlapeth, Gadchiroli, Maharashtra, India that operates steelmaking, direct reduced iron (DRI), and induction furnace (IF) technology.
Location
The map below shows the approximate location of the plant in Aheri, Wadlapeth, Gadchiroli, Maharashtra, India:
- Location:
- Coordinates (WGS 84): 19.487201, 79.968551 (approximate)
Background
Surjagad Ispat Pvt Ltd was established in 2023 to set up an integrated steel plant at Gadchiroli, Maharashtra, India.[1] The proposed plant encompasses multiple components including sponge iron units, induction furnace, rolling mill and a captive power plant.[2] The first phase is slated to commence by 2026, with the entire project expected to be completed by 2027.[1][3] The foundation stone of the plant was laid on 17 July, 2024.[4]
By August 2025, the INR 10,000 crore proposed project cleared its environmental public hearing.[5]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Construction date | Start date | Power source | Iron ore source |
|---|---|---|---|---|
| 2022[6] | 2024-07-17[7][6] | 2026[7][8] | 120 MW CPP[9] | Surajgad mines[10] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Surjagad Ispat Pvt Ltd [100.0%] | unknown [100.0%] | E100002004790 [100.0%] | Surjagad Ispat Pvt Ltd [100%][11] | unknown | E100002004790 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Main production equipment |
|---|---|---|
| finished rolled[12] | wire rod[10] | DRI; IF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Induction furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|
| announced | 750[9][12] | 1250[7][10] | 2000[7][10][9][12] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| announced | 948[9] | 948[9] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Pellets |
|---|
| 1200[7] |
Unit Details
Table 7: Direct Reduced Iron Furnace Details
| Unit name | Status | Announced date | Start date | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|
| unknown DRI (1) | announced[9] | 2024-07[9] | 2026[12][7] | not found | 237[9] |
| unknown DRI (2) | announced[9] | 2024-07[9] | 2026[12][7] | not found | 237[9] |
| unknown DRI (3) | announced[9] | 2024-07[9] | – | not found | 237[9] |
| unknown DRI (4) | announced[9] | 2024-07[9] | – | not found | 237[9] |
Table 8: Induction Furnace Details
| Unit name | Status | Start date | Current capacity (ttpa) |
|---|---|---|---|
| unknown IF (1) | announced[9] | 2030[12][7] | 750[12][9] |
Table 9: Induction Furnace Feedstock Details
| Unit name | Scrap-based |
|---|---|
| unknown IF (1) | None |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Surjagad Ispat - Premier Steel Manufacturing Company". Retrieved 2025-01-23.
- ↑ "Integrated Steel Plant Insight - Surjagadispat Pvt Ltd". 2024-08-01. Retrieved 2025-01-23.
- ↑ "Construction begins for Surjagad Ispat's steel plant in Gadchiroli with foundation stone laying - Construction Week India". 2024-07-29. Retrieved 2025-01-23.
- ↑ "Recent Post - Surjagadispat Pvt Ltd". 2024-07-30. Retrieved 2025-01-23.
- ↑ "JSW Steel, POSCO Forge Pact to Explore $6B Steel Plant in India | IndianWeb2.com". www.indianweb2.com. Retrieved 2025-10-23.
- ↑ 6.0 6.1 https://surjagadispatpvtltd.com/recent-post-2/.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 https://www.constructionweekonline.in/business/construction-begins-for-surjagad-ispats-steel-plant-in-gadchiroli-with-foundation-stone-laying.
{{cite web}}: Missing or empty|title=(help) - ↑ https://surjagadispatpvtltd.com/growth/.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 https://www.manufacturingtodayindia.com/surjagad-ispat-pvt-ltd-unveils-mega-steel-project-in-gadchiroli-with-rs-10000-crore-investment.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 10.3 https://surjagadispatpvtltd.com/mision/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://surjagadispatpvtltd.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 https://surjagadispatpvtltd.com/steel/.
{{cite web}}: Missing or empty|title=(help)