Imetame LNG Terminal, also known as Terminal de GNL Imetame, is a cancelled (inferred 4 y) LNG import terminal in Brazil.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Imetame LNG Terminal Barra do Riacho, Aracruz, Espírito Santo, Brazil[1][2] -19.857997, -40.074054 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Imetame LNG Terminal import[2] cancelled (inferred 4 y) – – False Imetame I power station[2]

Table 3: Cost

Name Facility type Cost Total known terminal costs
Imetame LNG Terminal import[2] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Imetame LNG Terminal import[2] cancelled (inferred 4 y) – – – –[3][3] 2025 (cancelled)

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Imetame LNG Terminal import[2] cancelled (inferred 4 y) Imetame Energia SA [100%][1][4] Gaele Participacoes e Empreendimentos Ltda –

Background

The Imetame LNG terminal would supply natural gas to the 1638 MW Imetame I power station proposed by Imetame Energia near their headquarters in Aracruz, Espírito Santo state. Imetame Energia obtained a preliminary permit for the power plant from Brazil's environmental regulatory authority Ibama in October 2019, allowing the project to compete in Brazil's future national energy auctions.[5] Construction of the terminal was to depend on the success of the power plant project in the auctions.[5][6][7] In January 2020, Total Gas & Power Business Services signed a letter of intention to supply gas for the project, whose anticipated start date was expected to be as early as 2025, pending results of the energy auctions.[8][9]

According to a July 2021 report from Brazil's national energy research agency, the Imetame terminal remained in the licensing phase, still awaiting a final investment decision.[10][11]

As of July 2023, no further development of the Imetame Terminal has been reported for more than two years, so it is presumed to be shelved.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 (PDF) https://web.archive.org/web/20240125090634/https://www.epe.gov.br/sites-pt/publicacoes-dados-abertos/publicacoes/PublicacoesArquivos/publicacao-412/Nota%20T%C3%A9cnica%20-%20Terminais%20de%20Regaseifica%C3%A7%C3%A3o%20de%20GNL%20no%20Brasil%20%28Ciclo%202018-2019%29.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "Terminais de GNL no Brasil, Ciclo 2019-2020" (PDF). EPE (Empresa de Pesquisa Energética). 2020-10-31. Archived from the original (PDF) on 2024-01-25.
  3. ↑ 3.0 3.1 https://web.archive.org/web/20210503221330/https://www.kincaid.com.br/total-assina-acordo-para-suprir-termeletrica-no-es/. Archived from the original on 03 May 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. ↑ https://web.archive.org/web/20240125090440/https://www.brainmarket.com.br/2020/01/13/total-assina-acordo-para-suprir-termeletrica-no-es/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 "Terminais de GNL no Brasil (pp 20-21)" (PDF). EPE (Empresa de Pesquisa Energética). October 2020.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "Terminais de Regaseificação de GNL no Brasil: Panorama dos Principais Projetos (pp 28-29)" (PDF). EPE (Empresa de Pesquisa Energética). August 30, 2019.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "Brazil prepares for a new phase of investments in LNG terminals". LNG Latin America & the Caribbean. Retrieved 2021-04-17.
  8. ↑ "Total assina acordo para suprir termelétrica no ES". Brainmarket. January 8, 2020.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "Total assina acordo para suprir termelétrica no ES". Petróleo Hoje. January 7, 2020.
  10. ↑ "Plano Indicativo de Terminais de GNL (p 33)" (PDF). EPE (Empresa de Pesquisa Energética). July 2021.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "PITER 2021: Indicative LNG Terminals Plan" (PDF). EPE (Empresa de Pesquisa Energética). October 2021.{{cite web}}: CS1 maint: url-status (link)