Torbat Heydarieh Khorasan Steel Complex (مجتمع فولاد تربت حیدریه, فولاد رخ, مجتمع فولاد رخ تربت حیدریه), also known as Foolad Rokh, is a steel plant in Torbat Heydariyeh, Central Khorasan, Iran that operates electric arc furnace (EAF) and direct reduced iron (DRI) technology.
The Torbat Heydarieh Steel Complex in Khorasan Province opened its first phase in early 2025 with a Direct Reduced Iron (DRI) unit and an Electric Arc Furnace (EAF).[1] The project has been widely described as the largest industrial project in the eastern part of Iran.[2] Despite that designation, the plant faced multiple issues with finances and permitting during construction, leading to a 2024 construction stoppage lasting several months which threw thousands of workers out of their jobs.[3]
% pig iron (unknown if basic/merchant or granulated)
% other iron
unknown EAF (1)
None
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.