Tosyali-SULB Benghazi steel plant (توسيالي - صلب) is a steel plant in Benghazi, Ras Al-Manqar, Libya that operates electric arc furnace (EAF) and direct reduced iron (DRI) technology.
Location
The map below shows the approximate location of the plant in Benghazi, Ras Al-Manqar, Libya:
Location:
Coordinates (WGS 84 ): 32.1818, 20.124361 (approximate)
Background
In 2024, the Turkish company Tosyali and the Libya United Steel Company for Iron and Steel (SULB) announced they would construct a plant east of Benghazi.[ 1] The three-phase plan for the plant would make it the largest Direct Reduced Iron (DRI) production site in the world, at 8.1 million tons annual in capacity.[ 2] [ 3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Libya United Steel Company for Iron and Steel Industry; Tosyalı Holding AŞ
unknown; 5000866267
E100002004577; E100001000709
Tosyali Sulb Steel Industries Joint Company [100%][ 6]
unknown
E100002003914 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Electric arc furnace steelmaking capacity
Nominal crude steel capacity (total)
announced
2700[ 4]
2700[ 4]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Unit Details
Table 7: Direct Reduced Iron Furnace Details
Unit name
Status
Announced date
Furnace manufacturer and model
Furnace type
Current capacity (ttpa)
unknown DRI (1)
construction[ 8]
2024-07-19[ 4]
Paul Wurth Midrex Flex[ 4] [ 8] [ 4]
shaft furnace
2500[ 6] [ 7]
unknown DRI (2)
announced[ 4]
2024-07-19[ 4]
Midrex Flex[ 4] [ 4]
shaft furnace
2800[ 6] [ 7]
unknown DRI (3)
announced[ 4]
2024-07-19[ 4]
Midrex Flex[ 4] [ 4]
shaft furnace
2800[ 6] [ 7]
Table 8: Direct Reduced Iron Furnace Reductant Details
Unit name
Current or initial reductant
Gas reductant
Hydrogen reductant status
unknown DRI (1)
gas
–
capable[ 9]
unknown DRI (2)
gas
gas (unknown type)
capable[ 9]
unknown DRI (3)
gas
gas (unknown type)
capable[ 9]
Table 9: Electric Arc Furnace Details
Unit name
Status
Announced date
Current capacity (ttpa)
unknown EAF
announced[ 4]
2024-07-19[ 4]
2700[ 4]
Table 10: Electric Arc Furnace Feedstock Details
Unit name
Scrap-based
% DRI
unknown EAF
unknown
>0[ 4]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources