Tosyali Algerie Oran steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Tosyali Algerie Oran steel plant (شركة توسيالي الجزائرية التركية للحديد والصلب, Tosyali Algérie) is a steel plant in Bethiqua, Oran, Algeria that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Bethiqua, Oran, Algeria:
- Location: Pole Economique Bethiqua - BP 175, Bethiqua, Oran, Algeria
- Coordinates (WGS 84): 35.770912, -0.263031 (exact)
Background
The Tosyali Algerie Oran steel plant was commissioned in 2013 and has since experienced rapid growth.[1] The plant's first MIDREX Direct Reduced Iron (DRI) unit began operating in 2018, and set a world record for the highest production from a single unit in 2020, then broke that record again with 2.28 million tons of production in 2021 .[2] In July 2021, the company announced it would be expanding capacity with an electric arc furnace facility with 2.7 million tons in annual capacity, and another green hydrogen capable DRI plant with 2.5 million tons in capacity. The expansion commenced operations in 2024.[3][4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Low-emissions/green steelmaking
This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.
Table 1: Green Steel Project Details
| Project 1 | |
|---|---|
| Project name | Tosyali Algerie Phase 4 |
| Company | Tosyali Holding |
| Company has climate goals? | No |
| Location | Bethia, Algeria |
| Project website | Site |
| Project scale | Full scale |
| Project status | Operating |
| Technology to be used | NG-DRI + EAF |
| Technology details | MIDREX Flex DRI - Transition from NG to H2 |
| Iron production capacity (million tonnes per year) | 2 |
| Steel production capacity (million tonnes per year) | 2 |
| CO2 capture (million tonnes CO2 per year) | Not applicable |
| Hydrogen generation capacity (MW) | Not applicable |
| Investment size (m USD) | Not stated |
| Partners | Not stated |
| Date of announcement | 9/25/2023 |
Plant Details
Table 2: General Plant Details
| Start date | Workforce size | Iron ore source |
|---|---|---|
| 2013[5] | 8000[6][7] | Gara Djebilet mine; Brazil, Chile, Canada, Mauritania[8][9] |
Table 3: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Tosyalı Holding AŞ | 5000866267 | E100001000709 | Tosyali Ironsteel Industry Algerie SpA [100%][10][11] | 5074196906 | E100000131071 [100%] |
Table 4: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment |
|---|---|---|---|---|
| semi-finished, finished rolled[12] | billet, wire rod, rebar, hot rolled, slab, pipe[12][13] | building and infrastructure | yes[14][7] | DRI; EAF |
Table 5: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 6200[15][5][16][17] | 6200[15][5][16][17] |
Table 6: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| operating | 5000[16][18][19] | 5000[16][18][19] |
Table 7: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Pellets |
|---|---|
| NF | 8000[20] |
Table 8: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | EAF production | Other/unknown steel production |
|---|---|---|
| 2019 | unknown | unknown |
| 2020 | unknown | unknown |
| 2021 | unknown | unknown |
| 2022 | unknown | unknown |
Table 9: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production | Total (all routes) |
|---|---|---|
| 2019 | 1540[21] | 1540[21] |
| 2020 | 2230[21] | 2230[21] |
| 2021 | 2285[22][23] | 2285[22][23] |
| 2022 | 2200[24][21] | 2200[24][21] |
| 2023 | 2360[21] | 2360[21] |
Unit Details
Table 10: Direct Reduced Iron Furnace Details
| Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|---|
| DRI Plant - 1 | operating[25] | – | 2018[26] | Midrex[27] | shaft furnace[28] | 2500[18][19] |
| DRI Plant - 2 | operating[22][29] | 2021[27] | 2024[27] | Paul Wurth Midrex[30][27] | shaft furnace[28] | 2500[18][16] |
Table 11: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant | Gas reductant | Hydrogen reductant status | Future hydrogen reductant color |
|---|---|---|---|---|
| DRI Plant - 1 | gas[27] | syngas (reformed methane)[27] | unknown | not found |
| DRI Plant - 2 | gas[27] | syngas (reformed methane)[27] | capable[30] | not found |
Table 12: Electric Arc Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) |
|---|---|---|---|---|
| EAF - 1 | operating[31][32] | 2013[5] | Tenova[33] | 1000[5] |
| EAF - 2 | operating[5][32] | 2018[5] | Tenova[17] | 2500[16][5][15] |
| EAF - 3 | operating[21] | 2024[34] | – | 2700[17][5] |
Table 13: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|---|
| EAF - 1 | yes[35] | 35.00[35] | 55.00[36][35] | unknown | – | unknown | unknown | unknown | 10.00[36][35] |
| EAF - 2 | yes[25] | 35.00[25] | 55.00[27][36][35] | unknown | unknown | unknown | unknown | unknown | 10.00[27][36][35] |
| EAF - 3 | yes[13] | 35.00[25] | 55.00[27][36][35] | unknown | unknown | unknown | unknown | unknown | 10.00[27][36][35] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "About Us - Tosyalı Algerie". www.tosyali-algerie.com. Retrieved 2025-10-29.
- ↑ "Tosyali Algerie Sets DRI Production Record in 2021, Contracts 2nd DRI Plant, MIDREX® Plant produces more than 2.28 million tons | Midrex Technologies, Inc". Midrex Technologies, Inc. Retrieved 2025-10-29.
- ↑ "Tosyali Algerie Reported Record DRI Production in 2021, Contracts for Second DRI Plant". AIST. 2/28/2022.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "Tosyalı Algeria commences slab production | SEAISI". www.seaisi.org. Retrieved 2024-10-16.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 https://www.tosyali-algerie.com/about-us.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.steelorbis.com/steel-news/latest-news/tosyali-algerie-to-commission-flat-steel-complex-in-oran-from-2024-1273694.htm?searchKey=algeria&sc=article.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://www.tosyali-algerie.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.seaisi.org/details/27809?type=news-rooms.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.tosyali-algerie.com/complex/mineral-dock.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20211216201002/https://prd-wret.s3-us-west-2.amazonaws.com/assets/palladium/production/atoms/files/myb3-2016-ag.pdf. Archived from the original (PDF) on 2021-12-16.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20200629174836/http://www.tosyali-algerie.com:80/tosyali.asp?id0=1. Archived from the original on 29 June 2020.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 https://web.archive.org/web/20221006175508/http://www.tosyali-algerie.com/tosyali.asp?id0=1&id1=23. Archived from the original on 2022-10-06.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.0 13.1 https://www.tosyali-algerie.com/complex.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220318111650/https://www.tosyali-algerie.com/arama-sonuc-sayfasi?keyword=iso+14001&language=406002&site=376000. Archived from the original on 2022-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 15.2 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF).
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help) - ↑ 16.0 16.1 16.2 16.3 16.4 16.5 https://web.archive.org/web/20220926134927/https://tenova.com/newsroom/press-releases/tenova-supply-new-electric-arc-furnace-eaf-tosyali-algeria. Archived from the original on 2022-09-26.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.0 17.1 17.2 17.3 https://web.archive.org/web/20211127060123/https://www.tosyali-algerie.com/en/the-complex/units-and-technologies/eaf-meltshop. Archived from the original on 2021-11-27.
{{cite web}}: Missing or empty|title=(help) - ↑ 18.0 18.1 18.2 18.3 (PDF) https://2024.aisusteel.org/wp-content/uploads/2024/10/Edward-James_MEED.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 19.0 19.1 19.2 (PDF) https://web.archive.org/web/20220318083849/http://www.midrex.com/wp-content/uploads/Midrex-Plants-Sheet2021-1.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.tosyali-algerie.com/complex/pelletization.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.0 21.1 21.2 21.3 21.4 21.5 21.6 21.7 21.8 https://web.archive.org/web/20240126193758/https://www.midrex.com/tech-article/tosyali-algerie-jewel-of-the-algerian-steel-industry/. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ 22.0 22.1 22.2 https://www.aist.org/news/steel-news/2022/february/tosyali-algerie-reported-record-dri-production-in.
{{cite web}}: Missing or empty|title=(help) - ↑ 23.0 23.1 https://www.tosyali-algerie.com/complex/direct-reduction-unit.
{{cite web}}: Missing or empty|title=(help) - ↑ 24.0 24.1 (PDF) https://repository.enp.edu.dz/jspui/bitstream/123456789/10782/1/FERHI.Soraya.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 25.0 25.1 25.2 25.3 https://web.archive.org/web/20210419182816/https://www.tosyaliholding.com.tr/en/our-scope-of-activity/group-companies/international-subsidiaries/tosyali-iron-steel-industry-algerie. Archived from the original on 2021-04-19. Retrieved 2024-05-21.
{{cite web}}: Missing or empty|title=(help) - ↑ "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
- ↑ 27.00 27.01 27.02 27.03 27.04 27.05 27.06 27.07 27.08 27.09 27.10 27.11 (PDF) https://web.archive.org/web/20240122233422/https://www.midrex.com/wp-content/uploads/Midrex-DFM-4Qtr2023-Final.pdf. Archived from the original (PDF) on 2024-01-22.
{{cite web}}: Missing or empty|title=(help) - ↑ 28.0 28.1 https://www.aist.org/tosyali-receives-hot-dri-conveyor-for-algerian-plant.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240309062339/https://gmk.center/en/news/tosyali-algerie-launches-second-dri-production-unit/. Archived from the original on 2024-03-09.
{{cite web}}: Missing or empty|title=(help) - ↑ 30.0 30.1 https://www.seaisi.org/details/25465?type=news-rooms.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.tosyali-algerie.com/complex/eaf-meltshop.
{{cite web}}: Missing or empty|title=(help) - ↑ 32.0 32.1 https://web.archive.org/web/20240126193936/https://greensteelworld.com/tosyali-algerie-sets-dri-production-record-in-2021. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ https://greensteelworld.com/tenova-to-supply-a-second-electric-arc-furnace-for-tosyali-algeria.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.seaisi.org/details/24765?type=news-rooms.
{{cite web}}: Missing or empty|title=(help) - ↑ 35.0 35.1 35.2 35.3 35.4 35.5 35.6 35.7 (PDF) https://www.tosyali-algerie.com/media/High%20Scrap%20Content%20Wire%20Rod.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 36.0 36.1 36.2 36.3 36.4 36.5 (PDF) https://www.tosyali-algerie.com/media/High%20DRI%20Content%20Rebar%20.pdf.
{{cite web}}: Missing or empty|title=(help)
