Tosyali Algerie Oran steel plant (Tosyali Algérie (French) ; شركة توسيالي الجزائرية التركية للحديد والصلب (Arabic)) is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Bethiqua, Oran, Algeria.
Location
The map below shows the exact location of the plant in Bethiqua, Oran, Algeria:
- Location: Pole Economique Bethiqua - BP 175, Bethiqua, Oran, Algeria
- Coordinates (WGS 84): 35.770912, -0.263031 (exact)
Background
The Tosyali Algerie Oran steel plant has seen increases in investments in phases since it first started operating.[1] In July 2021, the company announced it would be expanding capacity with a 2 mtpa electric arc furnace facility and 2.5 mtpa DRI plant. The expansion is set to commence operations in 2024.[2]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Workforce size |
---|---|---|---|---|---|
Main plant | Operating[3] | – | – | 2013[4][5] | 4000[6] |
Expansion | Operating[7][8] | 2018[5] | 2021-07[7] | 2024[6][8] | 2500[6] |
Expansion | Operating[7][8] | 2018[5] | 2021-07[7] | 2024[6][8] | 2500[6] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Main plant | Tosyalı Holding AŞ [100.0%] | E100001000709 [100%] | Tosyali Ironsteel Industry Algerie SPA[9][10] | 5074196906 | E100000131071 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|---|
Main plant | semi-finished; finished rolled[11] | billet, reinforced steel, rebar, wire rod[11] | DRI, EAF[12] | 1 Midrex DRI plant (2.5 MTPA, began in 2018); 1 EAF (began in 2016, Tenova)[13][14][15][16] |
Expansion | semi-finished; finished rolled[11] | billet, reinforced steel, rebar, wire rod[11] | DRI, EAF[12][17] | 1 DRI plant (Midrex and Paul Wurth), 1 EAF (Tenova)[7][17][16] |
Expansion | semi-finished; finished rolled[11] | billet, reinforced steel, rebar, wire rod[11] | DRI, EAF[12][17] | 1 DRI plant (Midrex and Paul Wurth), 1 EAF (Tenova)[7][17][16] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 3700 TTPA[18] | 3700 TTPA[18] |
Expansion | announced | 2000 TTPA[17][16] | 2000 TTPA[17][16] |
Expansion | operating | –[17][16] | –[17][16] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 2500 TTPA[19] | 2500 TTPA[19] |
Expansion | announced | –[16] | –[16] |
Expansion | operating | 2500 TTPA[16] | 2500 TTPA[16] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Pellets |
---|---|
Main plant | 4000 TTPA[20] |
Expansion | >0 TTPA[6] |
Expansion | >0 TTPA[6] |
Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 2280 TTPA[7] | 2280 TTPA |
2022 | – | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "Tosyalı Holding | Tosyalı Iron Steel Industry Algerie". www.tosyaliholding.com.tr. Retrieved 2023-06-22.
{{cite web}}
: horizontal tab character in|title=
at position 19 (help) - ↑ "Tosyali Algerie Reported Record DRI Production in 2021, Contracts for Second DRI Plant". AIST. 2/28/2022.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20210419182816/https://www.tosyaliholding.com.tr/en/our-scope-of-activity/group-companies/international-subsidiaries/tosyali-iron-steel-industry-algerie. Archived from the original on 19 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20200629174841/http://www.tosyali-algerie.com:80/tosyali.asp?id0=2. Archived from the original on 29 June 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20211127044200/https://www.tosyali-algerie.com/en/corporate/history. Archived from the original on 27 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 https://www.steelorbis.com/steel-news/latest-news/tosyali-algerie-to-commission-flat-steel-complex-in-oran-from-2024-1273694.htm?searchKey=algeria&sc=article.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://www.aist.org/news/steel-news/2022/february/tosyali-algerie-reported-record-dri-production-in.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 https://web.archive.org/web/20240309062339/https://gmk.center/en/news/tosyali-algerie-launches-second-dri-production-unit/. Archived from the original on 09 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20200629174836/http://www.tosyali-algerie.com:80/tosyali.asp?id0=1. Archived from the original on 29 June 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20211216201002/https://prd-wret.s3-us-west-2.amazonaws.com/assets/palladium/production/atoms/files/myb3-2016-ag.pdf. Archived from the original (PDF) on 16 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20221006175508/http://www.tosyali-algerie.com/tosyali.asp?id0=1&id1=23. Archived from the original on 06 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 https://web.archive.org/web/20220318212726/https://www.kobelco.co.jp/english/releases/1200447_15581.html. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220126172422/https://www.metalbulletin.com/Article/3850438/HBI-Pig-iron-and-DRI-all/Tosyali-Algeria-commissions-25m-tpy-direct-reduced-iron-plant.html. Archived from the original on 26 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220207220725/https://www.fastmarkets.com/article/3821672/focus-steelmaking-boom-in-algeria-likely-to-end-billet-imports. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220320173526/https://www.midrex.com/about-midrex/midrex-plants/. Archived from the original on 20 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 https://web.archive.org/web/20220926134927/https://tenova.com/newsroom/press-releases/tenova-supply-new-electric-arc-furnace-eaf-tosyali-algeria. Archived from the original on 26 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 https://web.archive.org/web/20211127060123/https://www.tosyali-algerie.com/en/the-complex/units-and-technologies/eaf-meltshop. Archived from the original on 27 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 (PDF) https://web.archive.org/web/20220318083849/http://www.midrex.com/wp-content/uploads/Midrex-Plants-Sheet2021-1.pdf. Archived from the original (PDF) on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211127055455/https://www.tosyali-algerie.com/en/the-complex/technologies/pelletizing. Archived from the original on 27 November 2021.
{{cite web}}
: Missing or empty|title=
(help)