UMC Metals Chon Buri steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
UMC Metals Chon Buri steel plant is a steel plant in Amphoe Muang, Chon Buri, Thailand that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Amphoe Muang, Chon Buri, Thailand:
- Location: 9/10 Moo 5 Sangsuk-Bangpra Road, Amphoe Muang, Chonburi 20130, Thailand
- Coordinates (WGS 84): 13.275832, 100.969791 (exact)
Background
UMC Metals Co. Ltd was established in 1994 in Chonburi Province in Thailand.[1] In November 2012, the plant installed the energy efficient ECOARC which was inaugurated on February 06, 2013, after demonstrating 30% energy savings in comparison to conventional electric arc furnaces.[2] The ECOARC was expected to replace the conventional EAF of capacity 380 ttpa installed in 2002 at the plant, which had been operating at the plant since.[3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Power source |
|---|---|
| 1994[4] | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| UMC Metals Ltd [100.0%] | 5000024091 [100.0%] | E100001000453 [100.0%] | UMC Metals Ltd [100%][4] | 5000024091 | E100001000453 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|---|---|
| semi-finished, finished rolled[5] | billet, round bar, bar[6] | yes[7][8] | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 805[9][10] | 805[9][10] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | EAF production | Other/unknown steel production |
|---|---|---|
| 2019 | unknown | unknown |
| 2020 | unknown | unknown |
| 2021 | unknown | unknown |
| 2022 | unknown | unknown |
Unit Details
Table 6: Electric Arc Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|
| unknown EAF (1) | operating[11] | 2012[12] | Steel Plantech Ecoarc[12][12] | 805[9][10] | 70.0[5] |
Table 7: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap |
|---|---|---|
| unknown EAF (1) | yes[5] | 100.00[13] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "UMC Metals Ltd. - Company Profile". thai-rebar.com. Retrieved 2023-11-13.
- ↑ "News : NEDO's energy-saving technology model project by ECOARC™, Environmentally Conscious High-Efficiency Arc Furnace, was successfully demonstrated at UMC Metals in Thailand | Steel Plantech" (in 日本語). Retrieved 2023-11-13.
- ↑ "Clean Development Mechanism Project Design Document Form". UNFCCC. 22 December 2006. Retrieved 13 November, 2023.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ 4.0 4.1 https://www.mbdatabase.com/Basic-Information/UMC-Metals-Ltd-formerly-Union-Metal-Co/11124/1.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20200924135841/http://www.umc.co.th/index.php?option=com_newsfeeds&catid=15&Itemid=42. Archived from the original on 2020-09-24.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.umc.co.th/index.php?option=com_newsfeeds&catid=21&Itemid=56.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) http://www.umc.co.th/files/The%20ISO14001&OHSAS18001.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20241008153525/https://cdm.unfccc.int/UserManagement/FileStorage/UYPKAN4QIOJ8M20BRSWVT136DHL9Z7.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 (PDF) https://web.archive.org/web/20190509160249/http://steelplantech.com/wp-content/uploads/2012/11/2012-09_The-First-ECOARC-in-KINGDOM-of-THAILAND.pdf. Archived from the original (PDF) on 2019-05-09.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 (PDF) https://web.archive.org/web/20230617170640/https://steelplantech.com/wp-content/uploads/2012/11/2012-09_The-First-ECOARC-in-KINGDOM-of-THAILAND.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20200924132636/http://www.umc.co.th/index.php?option=com_newsfeeds&catid=21&Itemid=56. Archived from the original on 2020-09-24.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 12.2 https://web.archive.org/web/20240122233907/https://steelplantech.com/product/ecoarc/. Archived from the original on 2024-01-22.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20240906184148/http://www.umc.co.th/files/umc3.pdf. Archived from the original (PDF) on 2024-09-06.
{{cite web}}: Missing or empty|title=(help)
