Wuhan Indonesia Steel Plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Wuhan Indonesia Steel Plant is an electric arc furnace (EAF) cancelled steel plant in Indonesia.

Location

The map below shows the approximate location of the plant in Indonesia:

Loading map...
  • Location:
  • Coordinates (WGS 84): -7.735566, 112.336410 (approximate)

Plant Details

Table 1: General Plant Details

Plant status Announced date
Cancelled[1] 2014-03-20[1]

Table 2: Ownership and Parent Company Information

Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Baoshan Iron & Steel Co Ltd [100.0%] E100000122571 [100%] Wuhan Iron and Steel Co., Ltd.[2] 5064669038 E100000123212

Table 3: Process and Products

Main production equipment Detailed production equipment
EAF[3] EAF (# unknown)[3]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
cancelled 5000 TTPA[1] 5000 TTPA[1]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Nominal iron capacity (total)
cancelled >0 TTPA[1]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240209184832/https://www.fastmarkets.com/insights/chinas-wisco-mulls-construction-of-steel-plant-in-indonesia/. Archived from the original on 09 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240209184541/https://www.thejakartapost.com/news/2014/03/20/china-s-wuhan-spend-5b-integrated-iron-steel-mill-2014.html. Archived from the original on 09 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2023.pdf. {{cite web}}: Missing or empty |title= (help)

Resources