Wulanhot Steel Co Ltd
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Wulanhot Steel Co Ltd (乌兰浩特钢铁有限责任公司) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Xing'an, Inner Mongolia, China.
Location
The map below shows the exact location of the plant in Xing'an, Inner Mongolia, China:
- Location: No. 29, Xinqiao West Street, Ulanhot City, Xing'an League, Inner Mongolia Autonomous Region
- Coordinates (WGS 84): 46.055685, 122.063282 (exact)
Background
The steelmaking equipment replacement and environmental protection renovation project in 2020 is to build a 120-ton basic oxygen furnace with a capacity of 1.35 million tons and remove the 70-ton basic oxygen furnace.[1]As of September 2021, it is unknown whether the project has completed.[2]
The company also plans to reduce and replace the existing 503m3 blast furnace, one 616m3 blast furnace, and part of the purchased iron-making capacity to build a 1200m3 blast furnace, which is planned to put into production in Nov. 2023. The annual output of iron is 1.13 million tons.[3]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|
Main plant | Operating[4] | – | 1999[4] | – | – | 2412[4] |
Closure | Retired[5] | – | – | 2022-04-24[5] | 2023-11[5] | – |
Expansion | Operating[6] | 2022-04[5] | 2023[6] | – | – | – |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company GEM ID | Owner | Owner company GEM ID |
---|---|---|---|---|
Main plant | Hebei Jingye Group Co Ltd [100.0%] | E100000123261 [100%] | Wulanhot Steel Co., Ltd.[4] | E100000126441 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | finished rolled[7] | bars, cast iron, steel slag cement[7] | building and infrastructure; tools and machinery[8] | 2021[8] | BF, BOF[7] | 1 BOF (1x120-tonne)[7] |
Closure | finished rolled[7] | bars, cast iron, steel slag cement[7] | building and infrastructure; tools and machinery[8] | – | BF[5] | –[5] |
Expansion | finished rolled[7] | bars, cast iron, steel slag cement[7] | building and infrastructure; tools and machinery[8] | – | BF[5] | –[5] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | 1350 TTPA[9] | 1350 TTPA[9] |
Closure | retired | – | – |
Expansion | operating | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | – | – |
Closure | retired | 1320 TTPA[5][5] | 1320 TTPA[5][5] |
Expansion | operating | 1130 TTPA[5] | 1130 TTPA[5] |
Blast Furnace Details
Table 6: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
unknown | operating[5] | 2022-04[5] | unknown | 2023-09-10 00:00:00[6] | – | 1200 m³[5] | 1130[5] | unknown | unknown |
unknown | retired[7] | unknown | unknown | unknown | 2023-11[5] | 616 m³[7] | 720[5] | unknown | 2020-08-17[10] |
unknown | retired[7] | unknown | unknown | unknown | 2023-11[5] | 503 m³[7] | 600[5] | unknown | 2020-08-17[10] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "乌兰浩特钢铁有限责任公司炼钢装备置换提升、产能置换项目环境影响评价第二次公示",敬业集团官网, July 8, 2019.
- ↑ "重大项目1-7月进展情况",乌兰浩特市发展和改革委员会,July 27, 2020.
- ↑ "乌兰浩特钢铁高炉升级改造项目炼铁产能置换方案公告",内蒙古工信厅,2022-04-24.
- ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20220112152839/https://www.qcc.com/firm/5466b7d12944b3a7d70f673ba04973f3.html. Archived from the original on 12 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 https://web.archive.org/web/20221017142623/https://finance.sina.com.cn/money/future/indu/2022-04-26/doc-imcwiwst4081491.shtml. Archived from the original on 17 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://www.sohu.com/a/719928043_121106854.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 https://web.archive.org/web/20220129210123/http://www.cslpc.org/News/Details/4/9235. Archived from the original on 29 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E4%B9%8C%E5%85%B0%E6%B5%A9%E7%89%B9%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E8%B4%A3%E4%BB%BB%E5%85%AC%E5%8F%B8&fromIndex=true.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20220119161020/http://hbjyjt.com/content/?1308.html. Archived from the original on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://factory.mysteel.com/20/0728/15/03F9C045186557FE.html.
{{cite web}}
: Missing or empty|title=
(help)