Yaxing Coal Mine No.1 Well

From Global Energy Monitor

Yaxing Coal Mine No.1 Well (内蒙古牙克石五九煤炭(集团)有限责任公司牙星分公司一号井) is an underground coal mine located in Manduhe Town, Yakeshi City, Hulunbuir City, Inner Mongolia, China.[1]

Location

The undated satellite photo below shows the exact location of the mine.

Loading map...


Coal Mine Background

Yaxing Coal Mine No.1 Well is operated by Inner Mongolia Yakeshi 59 Coal (Group) Co., Ltd. Construction started in July 1985, with a design production capacity of 0.15 million tons/year, completed and put into production in April 1989. Reconstruction and expansion were carried out in 2009.[2] As of March 31, 2021, the approved production capacity was 1.5 million tons per year. [3]

Project Details

  • Operator: Inner Mongolia Yakeshi 59 Coal (Group) Co., Ltd.[1]
  • Owner: Shandong Energy Group Co., Ltd.[1]
  • Location: Manduhe Town, Yakeshi City, Hulunbuir City, Inner Mongolia
  • GPS Coordinates: 49.063741, 120.861135
  • Status: Operating
  • Production Capacity: 1.5 million tonnes per annum[3]
  • Total Resource: 21.28 million tonne[4]
  • Mineable Reserves: 8.27 million tonne[2]
  • Coal Type: Long flame coal(Thermal)[2]
  • Mine Size: 12.4769 k㎡[5]
  • Mine Type: Underground
  • Start Year: 1989[2]


Articles and resources

References

Related GEM.wiki articles