Yazdani Steel and Power Kalinganagar steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Yazdani Steel and Power Kalinganagar steel plant is a steel plant in Kalinganagar, Jajpur, Odisha, India that operates steelmaking, direct reduced iron (DRI), and induction furnace (IF) technology.
Location
The map below shows the exact location of the plant in Kalinganagar, Jajpur, Odisha, India:
- Location: Kalinganagar, Jajpur, India
- Coordinates (WGS 84): 20.928285, 86.036604 (exact)
Background
Yazdani Steel & Power Limited is a Public incorporated on 29 October 2003 as Dinabandhu Steel & Power Ltd.[1] The company was taken over by Yazdani International Pvt ltd in May 2011, subsequent to which it was renamed Yazdani Steel & Power Limited.[2] The plant plans to expand its capacity from 70 ttpa to 1190 ttpa with an investment of INR 2,415 crores.[3] The expansion plan was approved by Odisha Government in 2021.[4] As of 2024 December, there hasn't any updates.
As of October 2025, there hasn't been any updates in the project expansion.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source | Iron ore source | Coal source |
|---|---|---|---|---|
| 2003[5] | 519[6] | 10 MW CPP (4 MW WHRB; 6 MW AFBC; Proposed to expand to 70 MW CPP (2x8 MW WHRB and 2x22 MW AFBC))[6][7] | Joda[6] | Imported via Paradip port[6] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Serajuddin & Co | 5001423902 | E100001016270 | Yazdani Steel and Power Ltd [100%][5] | 5068656453 | E100001012099 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|---|---|---|
| finished rolled[6] | billet, bar[6] | building and infrastructure[6] | unknown | unknown | DRI; IF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Induction furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|
| announced | 236[6] | 844[8] | 1080[6][8] |
| operating | 110[6][7] | – | 110[6][7] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| announced | 256[6][7] | 256[6][7] |
| operating | 72[6][7] | 72[6][7] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Ferronickel | Sinter | Coke | Pellets |
|---|---|---|---|
| NF | NF | NF | NF |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production |
|---|---|
| 2019 | unknown |
| 2020 | unknown |
| 2021 | unknown |
| 2022 | unknown |
| 2023 | unknown |
| 2024 | unknown |
Unit Details
Table 8: Direct Reduced Iron Furnace Details
| Unit name | Status | Announced date | Start date | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|
| unknown DRI (1) | operating[5] | – | 2003[5] | rotary kiln[6] | 36[6][7] |
| unknown DRI (2) | operating[5] | – | 2003[5] | rotary kiln[6] | 36[6][7] |
| unknown DRI (3) | announced[7] | 2018[9] | – | rotary kiln[6] | 128[6][7] |
| unknown DRI (4) | announced[7] | 2018[9] | – | rotary kiln[6] | 128[6][7] |
Table 9: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant |
|---|---|
| unknown DRI (1) | coal (solid)[7] |
| unknown DRI (2) | coal (solid)[7] |
| unknown DRI (3) | coal (solid)[6][7] |
| unknown DRI (4) | coal (solid)[6][7] |
Table 10: Induction Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|
| unknown IF (1) | operating[5] | – | 37[6][7] | 12.0 tonnes[6][7] |
| unknown IF (2) | operating[5] | – | 37[6][7] | 12.0 tonnes[6][7] |
| unknown IF (3) | operating[5] | – | 18[6][7] | 6.0 tonnes[6][7] |
| unknown IF (4) | operating[5] | – | 18[6][7] | 6.0 tonnes[6][7] |
| unknown IF (5) | announced[6] | 2019[6] | 59[6] | 25.0 tonnes[6] |
| unknown IF (6) | announced[6] | 2019[6] | 59[6] | 25.0 tonnes[6] |
| unknown IF (7) | announced[6] | 2019[6] | 59[6] | 25.0 tonnes[6] |
| unknown IF (8) | announced[6] | 2019[6] | 59[6] | 25.0 tonnes[6] |
Table 11: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI |
|---|---|---|---|
| unknown IF (1) | yes[6] | 20[6] | 80[6] |
| unknown IF (2) | yes[6] | 20[6] | 80[6] |
| unknown IF (3) | yes[6] | 20.00[6] | 80.00[6] |
| unknown IF (4) | yes[6] | 20.00[6] | 80.00[6] |
| unknown IF (5) | yes[6] | 20.00[6] | 80.00[6] |
| unknown IF (6) | yes[6] | 20.00[6] | 80.00 |
| unknown IF (7) | yes[6] | 20.00[6] | 80.00[6] |
| unknown IF (8) | yes[6] | 20.00[6] | 80.00 |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Basic Information". Zauba Corp. 07 May, 2023. Retrieved 17 October, 2023.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link) - ↑ "Final EIA/EMP Report". MoEF&CC. July 2022. Retrieved 11 January 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs named:0 - ↑ Pioneer, The. "Odisha needs tactical initiatives to meet steel output target". The Pioneer. Retrieved 2024-12-05.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 https://www.zaubacorp.com/company/YAZDANI-STEEL-POWER-LIMITED/U27102OR2003PLC007354.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 6.25 6.26 6.27 6.28 6.29 6.30 6.31 6.32 6.33 6.34 6.35 6.36 6.37 6.38 6.39 6.40 6.41 6.42 6.43 6.44 6.45 6.46 6.47 6.48 6.49 6.50 6.51 6.52 6.53 6.54 6.55 6.56 6.57 6.58 6.59 6.60 6.61 6.62 6.63 6.64 6.65 6.66 6.67 6.68 6.69 6.70 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/22_Feb_2019_165624717BRW1Q5TEPre-FeasibilityReport.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 7.20 7.21 7.22 7.23 7.24 https://web.archive.org/web/20240923212325/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=hH93gz76f6yPOaSbn7PCTae3e+oMkidNoi6mXyrVSa0FwEhThGNjQe9pFy0RJkLtShKTUWGq3+ovGAOhl6qKC67v1ebfghMnhf9J5UJtie4=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%252FpgnoBhDlYdZCxzVPEh4a7F53Cae7tleKGoXIDiA7chYePNgRJpehWx3dLsaLaee8RS5VxBvVdCAnIMg=. Archived from the original on 23 September 2024.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 https://web.archive.org/web/20210421081752/https://timesofindia.indiatimes.com/city/bhubaneswar/odisha-approves-8-investment-proposals-worth-rs-6400-crore/articleshow/80138282.cms. Archived from the original on 2021-04-21.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 https://web.archive.org/web/20240115055327/https://www.projectstoday.com/News/Yazdani-Steel--Power-awaits-clearance-to-augment-steel-capacity. Archived from the original on 2024-01-15.
{{cite web}}: Missing or empty|title=(help)