Zheneng Changxing power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Zheneng Changxing power station (浙能长兴发电厂, 浙能长兴电厂迁建项目) is an operating power station of at least 1200-megawatts (MW) in Heping Town, Changxing, Huzhou, Zhejiang, China with multiple units, some of which are not currently operating. It is also known as 浙能长兴电厂二期 (Phase II Unit 1&2), 浙能长兴电厂三期 (Phase III Unit 1&2).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Zheneng Changxing power station | Heping Town, Changxing, Huzhou, Zhejiang, China | 30.991944, 119.929722 (exact) |
Unit-level coordinates (WGS 84):
- Phase II Unit 1, Phase II Unit 2, Phase III Unit 1, Phase III Unit 2: 30.991944, 119.929722
- Replace Unit 1, Replace Unit 2: 30.845049, 119.878251
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase II Unit 1 | Operating | coal: bituminous[1] | 300 | subcritical | yes | 2003 | False |
| Phase II Unit 2 | Operating | coal: bituminous[1] | 300 | subcritical | yes | 2003 | False |
| Phase III Unit 1 | Operating | coal: bituminous[1] | 300 | subcritical | yes | 2006 | False |
| Phase III Unit 2 | Operating | coal: bituminous[1] | 300 | subcritical | yes | 2006 | False |
| Replace Unit 1 | Permitted[2] | coal: bituminous[1][2] | 1000[2] | ultra-supercritical[2] | yes[2] | 2028 (planned)[3] | False |
| Replace Unit 2 | Permitted[2] | coal: bituminous[1][2] | 1000[2] | ultra-supercritical[2] | yes[2] | 2028 (planned)[3] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase II Unit 1 | Zhejiang Zheneng Changxing Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [95.0%]; Changxing City Construction Investment Group Co Ltd [3.5%]; Changxing Zhejiang Financial Holding Group Co Ltd [1.3%]; unknown [0.2%] |
| Phase II Unit 2 | Zhejiang Zheneng Changxing Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [95.0%]; Changxing City Construction Investment Group Co Ltd [3.5%]; Changxing Zhejiang Financial Holding Group Co Ltd [1.3%]; unknown [0.2%] |
| Phase III Unit 1 | Zhejiang Zheneng Changxing Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [95.0%]; Changxing City Construction Investment Group Co Ltd [3.5%]; Changxing Zhejiang Financial Holding Group Co Ltd [1.3%]; unknown [0.2%] |
| Phase III Unit 2 | Zhejiang Zheneng Changxing Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [95.0%]; Changxing City Construction Investment Group Co Ltd [3.5%]; Changxing Zhejiang Financial Holding Group Co Ltd [1.3%]; unknown [0.2%] |
| Replace Unit 1 | Zhejiang Zheneng Changxing Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [95.0%]; Changxing City Construction Investment Group Co Ltd [3.5%]; Changxing Zhejiang Financial Holding Group Co Ltd [1.3%]; unknown [0.2%] |
| Replace Unit 2 | Zhejiang Zheneng Changxing Power Generation Co Ltd [100%] | Zhejiang Zheneng Electric Power Co Ltd [95.0%]; Changxing City Construction Investment Group Co Ltd [3.5%]; Changxing Zhejiang Financial Holding Group Co Ltd [1.3%]; unknown [0.2%] |
Project-level coal details
- Coal source(s): domestic/imported
- Permit(s): 浙发改项字〔2025〕410号[3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Zheneng Changxing power station is a 4 x 300 MW coal plant commissioned in 2003-2006.[4][5][6] It is located next to the retired units of Huaneng Changxing power station.
The replacement units (Replace Unit 1 and Replace Unit 2) saw feasibility study and consulting services tendered in May 2025[7][8]. The feasibility study contract was awarded in July 2025[9]. In September 2025, land acquisition and demolition began[10]. In December 2025, a main machinery tender was issued[11]. In February 2026, main machinery and EPC general contracting contracts were awarded[12][13]. The project was approved, and construction is scheduled to start in December 2026[14]. In April 2026, the EPC contract was awarded[15].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 https://mp.weixin.qq.com/s/_L8D_EunwidkELaxjCBWYA.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://mp.weixin.qq.com/s/YrbZf5UTt7wdqjTf5uN8yA.
{{cite web}}: Missing or empty|title=(help) - ↑ "Coal-Fired Plants in China - Zhejiang," Power Plants Around the World, accessed September 2016
- ↑ "List of major power stations in Zhejiang," Wikipedia, accessed September 2016
- ↑ 浙江浙能长兴发电有限公司 湖州市电力行业协会 10-24-2016
- ↑ "浙能长兴电厂迁建项目配套码头及支线航道工程可研采购". 中国招标网. 2025-05-09. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙能长兴电厂迁建项目可研及接入系统咨询服务招标". 中国招标网. 2025-05-29. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙江院中标浙能长兴电厂2×1000MW迁建项目可研及接入系统咨询". 北极星电力网. 2025-07-02. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙能长兴电厂迁建项目新址启动征拆". 微信公众平台. 2025-12-04. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙能长兴电厂2×1000MW迁建项目三大主机招标". 微信公众平台. 2026-01-06. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙能长兴电厂迁建项目三大主机中标公示". 北极星电力网. 2026-02-02. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙能长兴电厂迁建项目EPC总承包招标公告". 微信公众平台. 2026-03-09. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙能长兴电厂迁建项目EPC中标候选人公示". 微信公众平台. 2026-03-25. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国能建浙江院联合体中标浙能长兴电厂迁建EPC". 微信公众平台. 2026-06-30. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.