Zibo City High Pressure Gas Pipeline (Phase 1)
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Zibo City High Pressure Gas Pipeline (Phase 1) 淄博市全域高压燃气管网(一期) is a proposed gas pipeline in Zibo, Shandong province, China.[1]
Location
The pipeline is proposed to run from the Gaoqingmen Gate Station to the Kunlunmen Gate Station, passing through Gaoqing County, Huantai County, High-tech Zone, Economic Development Zone, Linzi District, Zhangdian District, and Zichuan District. The whole line is located in Zibo City.[2]
Project details
- Operator:
- Owner: Zibo Energy Group Natural Gas Pipe Network Co., Ltd.[2]
- Parent company: Zibo Efficient Finance Holding Co., Ltd.[3]
- Capacity: 3 bcm/y[1]
- Length: 144 km (121.5 km of the trunk pipeline and 22.5 km of the branch pipelines)[1]
- Diameter: 600/300 mm (600 mm for the trunk line and 300 mm for the branches)[1]
- Status: Proposed[1]
- Start year:
- Cost: 869.16 million RMB[2]
- Financing:
- Associated infrastructure: Tianjin LNG Ternminal Tangguantun-Zouping Gas Pipeline, Tai'an-Qingdao-Weihai Gas Pipeline Zibo Branch[1]
Background
The line will build 2 gate stations, 4 valve chambers and 5 valve wells along the line.[2]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 淄博市生态环境局关于2022年5月13日建设项目 环境影响评价文件受理情况的公示, 淄博市生态环境局, 2022-05-13
- ↑ 2.0 2.1 2.2 2.3 淄博市能源集团天然气管网有限公司淄博市全域高压燃气管网工程, 电力招标网,2023-06-28
- ↑ 淄博市能源集团天然气管网有限公司, QCC, Research date: 2023-07-26