Ziryansky Coal Mine
| This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
| Related-articles: |
Ziryansky Coal Mine (Зырянский разрез) is an operating coal mine in Ugolnoye, Verhnekolymsky, Sakha, Russia.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Ziryansky Coal Mine | Ugolnoye, Verhnekolymsky, Sakha, Russia | 65.7523307438771, 149.766555945934 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Operating | – | – | – |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| – | 0.25[1] | 2021[1] | Surface | Open Pit | – | 60* | 73[2] |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| – | – | – | – | Bituminous[3] | Thermal | Coal Plant |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Ziryansky Ugolny Razrez JSC [100.0%][1] | Ziryansky Ugolny Razrez JSC | Russia |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| – | – | – | – | 0.16[4] | 0.25*[1] | – | – | – | – |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Ziryansky Coal Mine (Зырянский разрез) is a SURFACE mine in Sakha Republic, Russia. The Ziryansky coal mine is owned and operated by Ziryansky Ugolny Razrez JSC. It appears to be owned by private individuals.[5]
Produced coal is shipped to the boiler plants in Yakutia as well as to Chukotka and Magadan District.[6]
In 2021, the company mentioned a plan to increase production up to 1 million tonnes per annum, however this would be dependent on the logistical solutions in the region, in particular for the railways.[7] As part of the assistance to the Ziryansky coal mine, Andrey Tarasenko, Chairman of the Government of Yakutia, instructed the regional Ministry of Transport to ensure guaranteed processing of cargoes in the Zyryanka river port, as well as at transit points. In addition, in order to improve the environmental situation in the region, it is planned to transfer the terminal transshipment of coal from the village to a separate land plot outside it.[7][8]
As of August 2021, the company planned to produce 0.25 million tonnes in 2021.[9] The company was not listed in the list of operating coal mines in the government document dated December 2023.[10] However it was presumed that it's still operating.
In July 2024, the Local arbitration court ordered the company to pay 3.237 million roubles (approximately US$35,700) in damages to the Federal Service for Supervision of Natural Resource Usage (Rosprirodnadzor) for soil contamination discovered during a scheduled inspection in October 2023. The company had declined a pre-trial demand for voluntary compensation, prompting the regulator to file suit.[11]
The Yakutia Region Ministry of Industry and Geology identified the Ziryansky coal mine as a prospective user of a planned Nizhny Bestyakh–Khandyga–Magadan railway, with projected shipments of 1.3 million tonnes per year. Preliminary design of the first stage (Nizhny Bestyakh–Khandyga, 375 km) was underway as of early 2025.[12]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://yk24.ru/main/poryadka-250-tys-tonn-uglya-dobudet-kompaniya-zyryanskij-ugolnyj-razrez-v-yakutii-v-2021-godu/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.rusprofile.ru/id/2947539.
{{cite web}}: Missing or empty|title=(help) - ↑ https://nedradv.ru/nedradv/ru/page_news?obj=2aee4c1622d0586d202846b9def14c58.
{{cite web}}: Missing or empty|title=(help) - ↑ https://nedradv.ru/nedradv/ru/find_nduser?obj=10f7520b909df3eb96b3edc18d6bbf22.
{{cite web}}: Missing or empty|title=(help) - ↑ "АО "ЗЫРЯНСКИЙ УГОЛЬНЫЙ РАЗРЕЗ"". /www.list-org.com. unknown.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "Зырянский угольный разрез". vnedra.ru. July 18, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ 7.0 7.1 ""Зырянский угольный разрез" столкнулся с проблемой вывоза угля из Якутии". yakutiamedia.ru. August 17, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ "АО «Зырянский угольный разрез»: работаем для Севера – и готовы работать больше". web.archive.org. August 2023.
{{cite web}}: CS1 maint: url-status (link) - ↑ "ПОРЯДКА 250 ТЫС ТОНН УГЛЯ ДОБУДЕТ КОМПАНИЯ «ЗЫРЯНСКИЙ УГОЛЬНЫЙ РАЗРЕЗ» В ЯКУТИИ В 2021 ГОДУ". yk24.ru. August 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ "ИТС 37-2023 ДОБЫЧА И ОБОГАЩЕНИЕ УГЛЯ". burondt.ru. December 2023.
{{cite web}}: line feed character in|title=at position 19 (help)CS1 maint: url-status (link) - ↑ "«Зырянский угольный разрез» по суду выплатит 3,2 млн рублей за нарушения". nedradv.ru. 2024-07-18. Retrieved 27 February 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "В Якутии разработают проект железной дороги для освоения новых месторождений". metallplace.ru. 2024-09-23. Retrieved 27 February 2026.
{{cite web}}: CS1 maint: url-status (link)