Almaty-Taldykorgan Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Almaty-Taldykorgan Gas Pipeline (Russian: МГ Алматы-Талдыкорган, Kazakh: Алматы-Талдықорған МГҚ) is an operating gas pipeline in Kazakhstan.[1]
Location
The pipeline runs from Almaty to Taldykorgan, Almaty Region, Kazakhstan.[2]
Project details
- Operator: Intergas Central Asia[1]
- Owner: Qazaqgaz[3]
- Parent company: Samruk-Kazyna SWF JSC[4]
- Capacity:
- Length: 264 km[2]
- Diameter: 530 mm[5]
- Status: Operating[5]
- Start year: 2017[5]
- Cost: 20 billion KZT[6]
- Financing:
- Associated infrastructure: Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline
Background
The construction of the Almaty-Taldykorgan gas pipeline and automatic gas distribution station was carried out on behalf of the Head of State and was under the personal control of the akim (governor) of the Almaty region.[2]
Articles and resources
References
- ↑ 1.0 1.1 "Общая информация". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 "Голубое топливо идет в Жетысу". kazpravda.kz (in русский). Retrieved 2022-07-19.
{{cite web}}
: zero width space character in|title=
at position 1 (help) - ↑ "About the company". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-19.
- ↑ 5.0 5.1 5.2 "Годовой отчет АО Интергаз Центральная Азия за 2020 год". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "В Алматинской области запущено строительство газопровода «Алматы-Талдыкорган»". KazTag. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link)