Chita Kyodo LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Chita Kyodo LNG Terminal is an operating LNG import terminal in Japan.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Chita Kyodo LNG Terminal Chita, Aichi, Chūbu, Japan 34.96664, 136.82288 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Chita Kyodo LNG Terminal import[1] operating[2] 7.5 mtpa[1] 7.5 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Chita Kyodo LNG Terminal import[1] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Chita Kyodo LNG Terminal import[1] operating[2] – – – 1977[2] –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Chita Kyodo LNG Terminal import[1] operating[2] JERA Co Inc; Toho Gas Co Ltd Chubu Electric Power Co Inc; Toho Gas Co Ltd; Tokyo Electric Power Co –

Background

Chita Kyodo LNG Terminal has been operating for over 40 years and received its first LNG from Indonesia in 1977.[3] This terminal is now part of the broader Chita LNG Terminal complex that also includes Chita LNG Terminal and Chita Midorihama LNG Terminal.[4]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://giignl.org/sites/default/files/PUBLIC_AREA/giignl_2021_annual_report_apr27.pdf. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 http://bit.ly/2sQ6hVC. {{cite web}}: Missing or empty |title= (help)
  3. ↑ Chita LNG Terminal Received a Total 3,500 LNG Tankers, Chubu Electric Power Co., May 7, 2015
  4. ↑ "Chita LNG Terminal Received a Total 3,000 LNG Tankers". Chubu Electric Power. November 21, 2011. Retrieved May 12, 2026.{{cite web}}: CS1 maint: url-status (link)