Chita LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Chita LNG Terminal is an operating LNG import terminal in Japan.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Chita LNG Terminal Chita, Aichi, Chūbu, Japan 34.96826, 136.82721 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Chita LNG Terminal import operating 10.9 mtpa 10.9 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Chita LNG Terminal import – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Chita LNG Terminal import operating – – – 1977 –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Chita LNG Terminal import operating Chita LNG Co Ltd; Chubu Electric Power Co Inc; Toho Gas Co Ltd Chita LNG Co Ltd; Chubu Electric Power Co Inc; Toho Gas Co Ltd –

Background

Chita LNG Terminal is an LNG terminal in Chūbu, Japan.[1]

Chita LNG Terminal received its first import of LNG in September 1983. In 2014 the terminal received its 3,500th tanker since it began operation. Chubu Electric Power and Toho Gas import LNG from Qatar and Indonesia for power generation and residential gas. As of 2014 the terminal was receiving 8.4 million tons of LNG per year.[2] Per more recent information such as the 2025 GIIGNL report, the capacity of the terminal is 10.9 mtpa.[3]

This terminal is now part of the broader Chita LNG Terminal complex that also includes Chita Kyodo LNG Terminal and Chita Midorihama LNG Terminal.[4]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ Chita LNG Terminal, A Barrel Full, accessed April 2017
  2. ↑ Chita LNG Terminal Receives 3500th Cargo, LNG World News, June 8, 2015
  3. ↑ "GIIGNL Annual Report 2025". GIIGNL. Retrieved May 12, 2026.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ "Chita LNG Terminal Received a Total 3,000 LNG Tankers". Chubu Electric Power. November 21, 2011. Retrieved May 12, 2026.{{cite web}}: CS1 maint: url-status (link)