Jaroslaw-Rozwadów Gas Pipeline is a proposed gas pipeline in Poland.[1]

Location

The pipeline would run from Jarosław, Poland, to Rozwadów, Poland.[1]

Loading map...

Pipeline Details

  • Operator: GAZ-SYSTEM S.A.[2]
  • Owner: GAZ-SYSTEM S.A.[2]
  • Parent: GAZ-SYSTEM S.A.[2]
  • Proposed Capacity:
  • Length: 60 km[3]
  • Diameter: 700 mm[4]
  • Cost: €53 million (US$60 million)[5]
  • Status: Proposed[6]
  • Start Year: 2029[1]
  • PCI Number: 6.2.2[1]

Background

The pipeline is listed as a Project of Common Interest by the European Commission, making it eligible for public funding. It is part of a proposed network in Eastern Europe meant to improve connectivity between Poland, Hungary, and Slovakia. The other pipelines in the network include: Rozwadów Koskowola Wronów Pipeline, Rembelszczyzna Wronów Pipeline, Hermanowice Jarosław Pipeline, Hermanowice Strachocina Pipeline, Tworóg Tworze Pipeline, Pogórska Wola Tworze Pipeline, Strachocina Pogórska Wola Pipeline, Gustorzyn Wronów Pipeline.[1] The network is listed on the European Network of Transmission System Operators for Gas (ENTSOG) ten year network development plan as "North - South Gas Corridor in Western Poland" and "TRA-F-245."[7]

In 2012, the European Network of Transmission System Operators for Gas (ENTSOG) Gas Regional Investment Plan BEMIP listed the "probable date of commissioning and the main milestones" for the Jaroslaw-Rozwadów Gas Pipeline as ending the permitting phase in 2016, reaching final investment decision in 2016 and commissioning in 2020.[5] However, the European Commission included the project among "new onshore pipelines and compressor stations in Eastern Poland" with a commissioning date of 2029.[8]

The project is included in Gaz System's Ten-Year Development Plan for 2026-2035, with the pipeline expected to be commissioned by 2035.[6] Additionally, a tender for this project is planned for the first quarter of 2026.[4]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 North – South Gas Corridor in Eastern Poland, European Commission, August 24, 2021
  2. 2.0 2.1 2.2 "Development Plan for satisfying current and future transmission demand for natural gas for 2014-2023" (PDF). Gaz-System. 2014. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. "Technical information on Projects of Common Interest" (PDF). Energy - European Commission. October 2014. Retrieved October 7, 2025.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "Plan Inwestycyjny status projektów" (PDF). Gaz System. October 2025. Retrieved October 7, 2025.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 BEMIP Gas Regional Investment Plan 2012 - 2021 – Annex: Infrastructure Projects, ENTSOG, 2012, accessed Dec. 17, 2021
  6. 6.0 6.1 "KRAJOWY DZIESIĘCIOLETNI PLAN ROZWOJU SYSTEMU PRZESYŁOWEGO NA LATA 2026-2035" (PDF). Gaz System. March 2025. Retrieved October 7, 2025.{{cite web}}: CS1 maint: url-status (link)
  7. European Network of Transmission System Operators for Gas (2020). "TYNDP - Annex A - Projects Tables RPJ007_NS_2020 - entsog". ENTSOG. Retrieved September 16, 2020.{{cite web}}: CS1 maint: url-status (link)
  8. North – South Gas Corridor in Eastern Poland, European Commission, November 2019