Rungta Mines Kamanda steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Rungta Mines Kamanda steel plant, also known as Kamanda steel plant, is a steel plant in Kamanda, Nuagaon, Sundergarh, Odisha, India that operates electric arc furnace (EAF), blast furnace (BF), direct reduced iron (DRI), and induction furnace (IF) technology.

Location

The map below shows the exact location of the plant in Kamanda, Nuagaon, Sundergarh, Odisha, India:

Loading map...
  • Location: Kamanda, Sundergarh, Odisha, India
  • Coordinates (WGS 84): 21.928511, 85.223988 (exact)

Background

The plant was sanctioned for environmental clearance for construction in June 2020. The construction of the plant began in 2021 and is ongoing.[1]

The company has announced further expansion of the steel plant from 970 ttpa to 1774 ttpa.[2]

In August 2023, Rungta Mines Ltd placed an order with Danieli for the supply of two new, high-speed bar and wirerod mills to be installed at Dhenkanal and Kamanda Steel plants in the state of Odisha, India. These will be the fifth and sixth Danieli rolling mill projects for the Indian steel producer.[3]

As of October 2025, there has been no update son the expansion of the plant capacity.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Announced date Workforce size Power source Iron ore source Coal source
2008[1] 2235[4] 40 MW CPP operating (20 MW WHRB+20MW AFBC); 367 MW Captive Power Plant proposed (96 MW WHRB; 271 MW AFBC/CFBC)[5] Rungta mines, OMC, RSPL[4][6] South Africa[6]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Rungta Mines Ltd [100.0%] 4298502619 [100.0%] E100000130898 [100.0%] Rungta Mines Ltd [100%][7] 4298502619 E100000130898 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 Main production equipment
semi-finished, finished rolled[4] billet, bar, strip, sheet, coil, wire rod[4][8] building and infrastructure[4] yes[9] BF; DRI; IF; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Induction furnace steelmaking capacity Nominal crude steel capacity (total)
announced 504[5] 924[4] 1428[5][4]
operating 347[4] 347[4]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
announced 1036[5] 834[5] 1870[5]
operating 635[5] 635[5]

Table 6: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production Other/unknown iron production
2019 unknown
2020 unknown
2021 unknown unknown
2022 unknown
2023 unknown
2024 unknown

Unit Details

Table 7: Blast Furnace Details

Unit name Status Announced date Construction date Current size Current capacity (ttpa) Decarbonization technology
BF 1 announced[5] 2016[10] 2021[5] 350.0 m3[5] 453[5] unknown
BF 2 announced[5] 2016[11] 2021[5] 450.0 m3[5] 583[5] unknown

Table 8: Direct Reduced Iron Furnace Details

Unit name Status Announced date Furnace type Current capacity (ttpa)
unknown DRI (1) operating[12][1][13] rotary kiln[5] 51[5]
unknown DRI (10) announced[5] 2016[10] rotary kiln[5] 261[5]
unknown DRI (11) announced[5] 2016[11] rotary kiln[5] 312[5]
unknown DRI (2) operating[12][13] rotary kiln[5] 51[5]
unknown DRI (3) operating[12][13] rotary kiln[5] 51[5]
unknown DRI (4) operating[12][13] rotary kiln[5] 51[5]
unknown DRI (5) operating[13] rotary kiln[5] 51[5]
unknown DRI (6) operating[13] rotary kiln[5] 51[5]
unknown DRI (7) operating[10] rotary kiln[5] 162[5]
unknown DRI (8) operating[10] rotary kiln[5] 167[5]
unknown DRI (9) announced[5] 2016[11] rotary kiln[5] 261[5]

Table 9: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant Current or initial hydrogen reductant color Hydrogen reductant status
unknown DRI (1) coal (solid)[5] not found unknown
unknown DRI (10) coal (solid)[5]
unknown DRI (11) coal (solid)[5]
unknown DRI (2) coal (solid)[5]
unknown DRI (3) coal (solid)[5]
unknown DRI (4) coal (solid)[5]
unknown DRI (5) coal (solid)[5]
unknown DRI (6) coal (solid)[5]
unknown DRI (7) coal (solid)[5]
unknown DRI (8) coal (solid)[5]
unknown DRI (9) coal (solid)[5]

Table 10: Electric Arc Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) announced[5] 2016[11] 504[5] 60.0[5]

Table 11: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % basic/merchant pig iron
unknown EAF (1) yes[5] >0[5] >0[5] unknown

Table 12: Induction Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size
unknown IF (1) operating[12][13] 87[4] 15.0 tonnes[4]
unknown IF (10) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (11) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (12) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (13) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (14) announced[4] 2016[11] 77[4] 20.0 tonnes[4]
unknown IF (15) announced[4] 2016[11] 77[4] 20.0 tonnes[4]
unknown IF (16) announced[4] 2016[11] 77[4] 20.0 tonnes[4]
unknown IF (2) operating[12][13] 87[4] 15.0 tonnes[4]
unknown IF (3) operating[12][13] 87[4] 15.0 tonnes[4]
unknown IF (4) operating[12][13] 86[4] 15.0 tonnes[4]
unknown IF (5) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (6) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (7) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (8) announced[4] 2016[11] 77[4] 15.0 tonnes[4]
unknown IF (9) announced[4] 2016[11] 77[4] 15.0 tonnes[4]

Table 13: Induction Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown IF (1) None unknown
unknown IF (10) None unknown
unknown IF (11) None unknown
unknown IF (12) None unknown
unknown IF (13) None unknown
unknown IF (14) None unknown
unknown IF (15) None unknown
unknown IF (16) None unknown
unknown IF (2) None unknown
unknown IF (3) None unknown
unknown IF (4) None unknown
unknown IF (5) None unknown
unknown IF (6) None unknown
unknown IF (7) None unknown
unknown IF (8) None unknown
unknown IF (9) None unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 (PDF) https://ospcboard.odisha.gov.in/wp-content/plugins/hearing/uploads/files_1495522042_1311705522.pdf. {{cite web}}: Missing or empty |title= (help)
  2. "Draft EIA" (PDF). Odisha State Pollution Control Board. January 2021. Retrieved 10 January 2024.{{cite web}}: CS1 maint: url-status (link)
  3. "Rungta Mines orders two more new, high-speed bar & wirerod mills ‹ Danieli". www.danieli.com. Retrieved 2025-01-23.
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33 4.34 4.35 4.36 4.37 4.38 4.39 4.40 4.41 4.42 4.43 4.44 4.45 4.46 4.47 4.48 4.49 4.50 4.51 4.52 (PDF) https://ospcboard.odisha.gov.in/wp-content/plugins/hearing/uploads/files_1611318872_1509842680.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 5.29 5.30 5.31 5.32 5.33 5.34 5.35 5.36 5.37 5.38 5.39 5.40 5.41 5.42 5.43 5.44 5.45 5.46 5.47 5.48 5.49 5.50 5.51 5.52 5.53 5.54 5.55 5.56 5.57 (PDF) https://web.archive.org/web/20240115051318/https://ospcboard.org/wp-content/plugins/hearing/uploads/files_1611318872_1509842680.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 "Compliances" (PDF). Forest Clearance. 2020. Archived from the original (PDF) on 2025-03-07. Retrieved 2024-11-12.
  7. https://web.archive.org/web/20220111145838/https://www.therungtagroup.com/. Archived from the original on 2022-01-11. {{cite web}}: Missing or empty |title= (help)
  8. https://www.danieli.com/en/news-media/news/rungta-mines-orders-two-more-new-high-speed-bar-wirerod-mills_37_831.htm. {{cite web}}: Missing or empty |title= (help)
  9. "Rungta Steel TMT Bar" (PDF). Archived from the original (PDF) on 2025-03-07. Retrieved 2024-11-12.
  10. 10.0 10.1 10.2 10.3 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=Yn0uZ63wGf2mpyYM67JasJE+KOpYj/0HuO0UkPOAo2DAwk7PQ9WRqWENmiRucYIe+4UEUUSZaXO9b3oakJcAMhDCsoIb5d0Wea74+2LNPwM=&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==. {{cite web}}: Missing or empty |title= (help)
  11. 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 11.10 11.11 11.12 11.13 11.14 11.15 "Amendment of TOR for expansion" (PDF). Environmental clearance. 2016-11-14. Archived from the original (PDF) on 2025-03-07. Retrieved 2024-11-11.
  12. 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 "Amendment in EC of ISP located at village Kamanda in District SUndergarh of Odisha by M/s Rungta Mines Limited" (PDF). EnvironmentClearance.nic.in. 2019-03-25. Archived from the original (PDF) on 2025-07-14. Retrieved 2024-12-02.
  13. 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 "Pre-feasibility report for enhancement of DRI, SMS, Billets, Caster and Rolling mill". Environmental clearance. 2018-09. Archived from the original on 2025-03-07. Retrieved 2024-11-12. {{cite web}}: Check date values in: |date= (help)

Resources