Rungta Mines Kamanda steel plant , also known as Kamanda steel plant, is a steel plant in Kamanda, Nuagaon, Sundergarh, Odisha, India that operates electric arc furnace (EAF), blast furnace (BF), direct reduced iron (DRI), and induction furnace (IF) technology.
Location
The map below shows the exact location of the plant in Kamanda, Nuagaon, Sundergarh, Odisha, India:
Location: Kamanda, Sundergarh, Odisha, India
Coordinates (WGS 84 ): 21.928511, 85.223988 (exact)
Background
The plant was sanctioned for environmental clearance for construction in June 2020. The construction of the plant began in 2021 and is ongoing.[ 1]
The company has announced further expansion of the steel plant from 970 ttpa to 1774 ttpa.[ 2]
In August 2023, Rungta Mines Ltd placed an order with Danieli for the supply of two new, high-speed bar and wirerod mills to be installed at Dhenkanal and Kamanda Steel plants in the state of Odisha, India. These will be the fifth and sixth Danieli rolling mill projects for the Indian steel producer.[ 3]
As of October 2025, there has been no update son the expansion of the plant capacity.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Announced date
Workforce size
Power source
Iron ore source
Coal source
2008[ 1]
2235[ 4]
40 MW CPP operating (20 MW WHRB+20MW AFBC); 367 MW Captive Power Plant proposed (96 MW WHRB; 271 MW AFBC/CFBC)[ 5]
Rungta mines, OMC, RSPL[ 4] [ 6]
South Africa[ 6]
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Rungta Mines Ltd [100.0%]
4298502619 [100.0%]
E100000130898 [100.0%]
Rungta Mines Ltd [100%][ 7]
4298502619
E100000130898 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Electric arc furnace steelmaking capacity
Induction furnace steelmaking capacity
Nominal crude steel capacity (total)
announced
504[ 5]
924[ 4]
1428[ 5] [ 4]
operating
–
347[ 4]
347[ 4]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Sponge iron/DRI capacity
Nominal iron capacity (total)
announced
1036[ 5]
834[ 5]
1870[ 5]
operating
–
635[ 5]
635[ 5]
Table 6: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
DRI production
Other/unknown iron production
2019
unknown
–
2020
unknown
–
2021
unknown
unknown
2022
unknown
–
2023
unknown
–
2024
unknown
–
Unit Details
Table 7: Blast Furnace Details
Unit name
Status
Announced date
Construction date
Current size
Current capacity (ttpa)
Decarbonization technology
BF 1
announced[ 5]
2016[ 10]
2021[ 5]
350.0 m3[ 5]
453[ 5]
unknown
BF 2
announced[ 5]
2016[ 11]
2021[ 5]
450.0 m3[ 5]
583[ 5]
unknown
Table 8: Direct Reduced Iron Furnace Details
Unit name
Status
Announced date
Furnace type
Current capacity (ttpa)
unknown DRI (1)
operating[ 12] [ 1] [ 13]
–
rotary kiln[ 5]
51[ 5]
unknown DRI (10)
announced[ 5]
2016[ 10]
rotary kiln[ 5]
261[ 5]
unknown DRI (11)
announced[ 5]
2016[ 11]
rotary kiln[ 5]
312[ 5]
unknown DRI (2)
operating[ 12] [ 13]
–
rotary kiln[ 5]
51[ 5]
unknown DRI (3)
operating[ 12] [ 13]
–
rotary kiln[ 5]
51[ 5]
unknown DRI (4)
operating[ 12] [ 13]
–
rotary kiln[ 5]
51[ 5]
unknown DRI (5)
operating[ 13]
–
rotary kiln[ 5]
51[ 5]
unknown DRI (6)
operating[ 13]
–
rotary kiln[ 5]
51[ 5]
unknown DRI (7)
operating[ 10]
–
rotary kiln[ 5]
162[ 5]
unknown DRI (8)
operating[ 10]
–
rotary kiln[ 5]
167[ 5]
unknown DRI (9)
announced[ 5]
2016[ 11]
rotary kiln[ 5]
261[ 5]
Table 9: Direct Reduced Iron Furnace Reductant Details
Unit name
Current or initial reductant
Current or initial hydrogen reductant color
Hydrogen reductant status
unknown DRI (1)
coal (solid)[ 5]
not found
unknown
unknown DRI (10)
coal (solid)[ 5]
–
–
unknown DRI (11)
coal (solid)[ 5]
–
–
unknown DRI (2)
coal (solid)[ 5]
–
–
unknown DRI (3)
coal (solid)[ 5]
–
–
unknown DRI (4)
coal (solid)[ 5]
–
–
unknown DRI (5)
coal (solid)[ 5]
–
–
unknown DRI (6)
coal (solid)[ 5]
–
–
unknown DRI (7)
coal (solid)[ 5]
–
–
unknown DRI (8)
coal (solid)[ 5]
–
–
unknown DRI (9)
coal (solid)[ 5]
–
–
Table 10: Electric Arc Furnace Details
Unit name
Status
Announced date
Current capacity (ttpa)
Current size (tonnes)
unknown EAF (1)
announced[ 5]
2016[ 11]
504[ 5]
60.0[ 5]
Table 11: Electric Arc Furnace Feedstock Details
Unit name
Scrap-based
% scrap
% DRI
% basic/merchant pig iron
unknown EAF (1)
yes[ 5]
>0[ 5]
>0[ 5]
unknown
Table 12: Induction Furnace Details
Table 13: Induction Furnace Feedstock Details
Unit name
Scrap-based
% scrap
unknown IF (1)
None
unknown
unknown IF (10)
None
unknown
unknown IF (11)
None
unknown
unknown IF (12)
None
unknown
unknown IF (13)
None
unknown
unknown IF (14)
None
unknown
unknown IF (15)
None
unknown
unknown IF (16)
None
unknown
unknown IF (2)
None
unknown
unknown IF (3)
None
unknown
unknown IF (4)
None
unknown
unknown IF (5)
None
unknown
unknown IF (6)
None
unknown
unknown IF (7)
None
unknown
unknown IF (8)
None
unknown
unknown IF (9)
None
unknown
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources