Search results

From Global Energy Monitor
Results 1 – 9 of 9
Advanced search

Search in namespaces:

  • IngridSandbox (category Coal power stations in Réunion)
    Le Gol power station Le Gol power station is an operating power station of at least 122-megawatts (MW) in Réunion, Réunion. The map below shows the exact
    6 KB (501 words) - 19:24, 9 November 2023
  • La Baie power station (category Oil & Gas power stations in Réunion)
    La Baie power station is an operating power station of at least 80-megawatts (MW) in Port Réunion Est, Réunion, Réunion. The map below shows the exact
    4 KB (330 words) - 06:03, 25 February 2024
  • Le Port Est power station (category Oil & Gas power stations in Réunion)
    Le Port Est power station is an operating power station of at least 219-megawatts (MW) in Port Réunion Est, Réunion, Réunion. The map below shows the exact
    4 KB (376 words) - 23:06, 11 May 2024
  • Bois-Rouge power station (category Coal power stations in France)
    (solids) in 2023. Project-level captive use details Captive industry use (heat or power): sugar Captive industry: Power Project-level coal details Coal source(s):
    7 KB (651 words) - 20:37, 11 May 2024
  • Le Gol power station (category Coal power stations in France)
    planning to switch the power station to 100% biomass by 2024. The island's power stations burn both coal and bagasse, with coal still representing approximately
    6 KB (523 words) - 23:06, 11 May 2024
  • Región Carbonífera". vanguardia.com.mx (in español). Retrieved 2022-04-27. "Perspectives from the coal industry in Mexico: A systems approach" (PDF). WWF
    41 KB (4,016 words) - 16:03, 3 October 2022
  • Termopaipa power station (category Coal power stations in Colombia)
    operation in 1963, Unit 2 in 1975, Unit 3 in 1982, and Unit 4 in 1999. In June 2022, it was reported that Gensa was planning to build solar-power generating
    16 KB (1,160 words) - 01:10, 12 May 2024
  • Sabal Trail Gas Transmission Pipeline (category Proposed pipelines in the United States) (section Florida Power and Light Expansion Project/Phase III)
    162 miles in Georgia, 268 miles in Florida) and, initially, at least two compressor stations at the beginning and end of the pipeline system. A total of five
    11 KB (1,503 words) - 11:54, 11 August 2023
  • Northern Gateway Oil Pipeline Project (category Proposed pipelines in Canada) (section Tanker moratorium in British Columbia)
    pumping stations were in non-compliance to safety rules set out by the NEB. The NEB rules broken included lack of backup power at all but 8 stations and no
    54 KB (6,176 words) - 20:32, 27 February 2023