Visakhapatnam Port EQ1 Coal Terminal
| This article is part of the Global Coal Terminals Tracker, a project of Global Energy Monitor. |
| Please visit Global Energy Monitor to download the dataset |
| Sub-articles: |
| Related-articles: |
The Visakhapatnam Port EQ1 Coal Terminal is an operating mechanized bulk terminal at Visakhapatnam Port in Visakhapatnam, Andhra Pradesh, India. The facility is located at East Quay 1 in the port's inner harbour.
Location
The terminal is located at Visakhapatnam Port, on the east coast of India in the state of Andhra Pradesh, along the Bay of Bengal.
Background
The terminal was developed by Adani Vizag Coal Terminal Private Limited, a subsidiary of Adani Ports and Special Economic Zone, under a build-design-finance-operate-transfer concession. Commercial operations began on October 1, 2014.[1]
The concession ended in 2021 following a dispute between Adani and the Visakhapatnam Port Authority. The port authority subsequently assumed control of the terminal and continued operating EQ1.[2]
The original terminal had a coal-handling capacity of 6.41 million tonnes per year. In 2025, environmental approval was granted for a configuration with total capacity of 6.8 million tonnes per year, comprising 5.8 million tonnes of mechanized handling of coal of all types and 1 million tonnes of conventionally handled limestone.[3]
Terminal Details
- Operator: Visakhapatnam Port Authority (formerly Adani Vizag Coal Terminal Private Limited)
- Location: Visakhapatnam, Visakhapatnam district, Andhra Pradesh, India
- Coordinates: 17.6964, 83.2828 (exact)
- Annual Coal Capacity (Million tonnes per annum): 5.8[3]
- Status: Operating
- Start year: 2014[1]
- Type: Import
- Coal type: Steam coal and other coal types
Articles and Resources
Sources
- ↑ 1.0 1.1 (2024) Adani Vizag Coal Terminal Private Limited: Financial Statements for the year ended March 31, 2024 . Adani Ports and Special Economic Zone Limited. Report.
- ↑ (2022) Administration Report 2021-22 . Visakhapatnam Port Authority. Report.
- ↑ 3.0 3.1 (2025-05-08) Environmental Clearance for Modernization of Existing Berths EQ-1 and EQ-1A . Ministry of Environment, Forest and Climate Change. Report.