Porto do Açu FSRU is a floating storage and regasification unit in Port of Açu, Brazil.

Location

The terminal is located in the Açu port complex in São João da Barra, Rio de Janeiro state, Brazil.[1]

Loading map...

Project Details

  • Sponsor: Gás Natural Açu (GNA)[2]
  • Owner: Prumo Logistica (46.9%), Siemens (33%), BP (20.1%)[3][4]
  • Location: Porto do Açu, São João da Barra, Rio de Janeiro state, Brazil[1]
  • Coordinates: -21.811314, -40.981673 (approximate)
  • Capacity: 5.6 mtpa[3]
  • Status: Operating[5]
  • Type: Import
  • Start Year: 2021[5][6]
  • Financing: A banking consortium consisting of Bank of America, Crédit Agricole, OCBC Bank, Société Générale and Sumitomo Mitsui provided a US$232 million loan for the construction and acquisition of a FSRU vessel (BW Magna) by BW Group.[7]

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

The Porto do Açu LNG terminal is part of the massive Porto do Açu port project on Brazil's Atlantic coast. Developed by GNA (Gás Natural Açu), a consortium formed by Prumo, BP, and Siemens[8], the terminal consists of a permanently moored FSRU (floating storage and regasification unit) with a regasification capacity of 21 million cubic meters per day and a storage capacity of 174,000 cubic meters. Initial plans call for the terminal to supply the 1338 MW GNA I power station and the 1672 GNA II power station in São João da Barra, which are scheduled to begin operating in 2021 and 2023, respectively.[1][9][10][11]

The floating regasification unit (FSRU) was commissioned by GNA from BW LNG. It was built in South Korea and scheduled for delivery by the South Korean shipyard DSME. The FSRU is designed for LNG transfer operations in ship-to-ship mode, with LNG to be imported periodically according to the needs of the Brazilian electrical system.[7][8]

GNA has studied several future expansion options for the Porto do Açu facility, including doubling its regasification capacity with the addition of a second FSRU, adding storage capacity in the form of six LNG storage tanks with a capacity of 180,000 cubic meters each, enhancing distribution potential to Brazil's internal market by linking to the Gasene Gas Pipeline at Campo de Goytacazes, or supplying gas to additional power plants in Rio de Janeiro state such as the Norte Fluminense power station and the Marlim Azul power station.[9]

The Porto do Açu terminal obtained its final installation license from INEA (Rio de Janeiro's environmental agency) in December 2018.[9] The FSRU arrived at the Port of Açu in February 2020[12] and received its first imported LNG cargo from BP in January 2021.[5][6][11]

FSRU BW Magna, purpose built for the Gas Natural Açu (GNA) LNG-to-power project developed at the Port of Açu, received its commissioning LNG cargo at the end of 2020. The project includes two natural gas-fired power stations of 1.3 GW and 1.6 GW capacity and an LNG import terminal with a regasification capacity of 21 Mm3/day. The newly built FSRU owned by BW has 173,400 m3 of storage capacity. Klaipedos Nafta (KN), the Lithuanian LNG terminal operator, has been appointed as the operator of the Port of Açu LNG terminal onshore facilities. The LNG will be supplied by BP, which is a shareholder of the GNA project along with Prumo Logistica and Siemens. The Port of Açu regasification facility is planned to start commercial operations in the first half of 2021.[13]

Articles and resources

References

  1. 1.0 1.1 1.2 "Terminais de GNL no Brasil (pp 22-23)" (PDF). EPE (Empresa de Pesquisa Energética). October 2020.
  2. "Gás Natural Açu | Prumo Logística". Prumo Logística. Retrieved 2021-04-19.
  3. 3.0 3.1 "2020 World LNG Report". IGU. April 27, 2020.
  4. "About the Port / Prumo". Porto do Açu. Retrieved April 19, 2021.
  5. 5.0 5.1 5.2 Brazil’s GNA receives first LNG cargo in Rio de Janeiro’s port, Hellenic Shipping News, January 5, 2021
  6. 6.0 6.1 "GNA recebe primeira carga de GNL no Porto do Açu - Petróleo Hoje". Petróleo Hoje. January 4, 2021.
  7. 7.0 7.1 BW Magna FSRU Vessel IJGlobal, Jan. 20, 2020
  8. 8.0 8.1 FSRU OF THE AÇU PORT READY IN 2019 Brazil Energy Insight, August 29, 2018
  9. 9.0 9.1 9.2 "Terminais de Regaseificação de GNL no Brasil: Panorama dos Principais Projetos (pp 24-26)" (PDF). EPE (Empresa de Pesquisa Energética). August 30, 2019.
  10. "Brazil prepares for a new phase of investments in LNG terminals". LNG Latin America & the Caribbean. Retrieved 2021-04-24.
  11. 11.0 11.1 GNA's 1.3 GW LNG-to-power complex received its first cargo (Brazil), Enerdata, Jan. 8, 2021
  12. Annual Report, GIIGNL, 2020
  13. GIIGNL 2021 Annual Report, accessed May 5, 2021

Related GEM.wiki articles

External resources

External articles