Integrated Belpahar, Lakhanpur, Lilari Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Integrated Belpahar, Lakhanpur, Lilari Coal Mine is a proposed coal mine in Lakhanpur, Jharsuguda, Odisha, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Integrated Belpahar, Lakhanpur, Lilari Coal Mine | Lakhanpur, Jharsuguda, Odisha, India[1] | 21.771004, 83.854397 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Project Type | Opening Year | Closing Year |
---|---|---|---|---|
Proposed | Permitted[2] | New | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
10[1] | – | – | Surface | Open Pit | 44.0[1] | 50.0* | – |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
1262.0 | – | – | Ib Valley[1] | Lignite | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Mahanadi Coalfields Ltd [100%] | Coal India Ltd [100.0%] | India |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker May 2025 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Integrated Belpahar-Lakhanpur-Lilari Project is a 40 million tonnes per annum (MTPA) opencast coal mine proposed by Mahanadi Coalfields Limited in Odisha State, India.[3][4]
The project's Terms of reference (TOR) were granted in 2019. As of 2023, the environmental clearance (EC) is still pending approval.[5] The Integrated Belpahar-Lakhanpur-Lilari Project is part of the Ib Valley coal mines, owned by Mahanadi Coalfields Limited (a subsidiary of state-owned Coal India).[6] The proposed project is an integration of three different existing mines: the Lakhanpur coal mine, Belpahar coal mine, and Lilari opencast mine.[7]
The capacity would increase current Ib Valley coal operations by 10 million tonnes.
In response to a right of information request in 2021, the mine is not listed by the Government of India as an active new mine project.[8]
Lilari Opencast
The standalone Lilari Opencast mine began operations in 1988.[9] It was approved to produce up to 0.8 million tonnes per annum, and ceased coal production in April 2018.[9] According to the mine plan for the Belpahar-Lakhanpur-Lilari OC mine, Lilari's bottom seams (Ib and Rampur) will be extracted for the integrated project.[9]
- Operator: Mahanadi Coalfields Limited
- Owner: Mahanadi Coalfields Limited (Coal India)
- Location: Bandhabal, Jharsuguda district, Odisha state, India
- Coordinates: 21.771004, 83.849162 (approximate)
- Status: Proposed[5]
- Production Capacity: 40 million tonnes per annum[7]
- Total Resource:
- Mineable Reserves: 1262 million tonnes[10]
- Coal Type: Lignite
- Mine Type: Surface, Opencast[7]
- Start Year: TBD
- Source of Financing:
- Permits:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=qr9z/J8VNMFnvX1MIngO01XLM6dgBpGLt8GpSrjMKxEVesCcXyFRcy2GI9+6parUATXojOxUQeT7zrmPWxKA7vcJepY6yaOKz0Ernj5QRjTM3yRhVbRgDyVpykF18j24eiUloen6hXg5+aST+ST0mA==&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z/pgnoBhDlYdZCxzXmG8GlihX6H9UP1HygCn3pCkAF2zPFXFQNqA4krKa1Aw==.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20250326003824/https://indiainvestmentgrid.gov.in/opportunities/project/400187. Archived from the original on 26 March 2025.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Mahanadi Coalfields Limited, Bioprofile of Projects, accessed March 16, 2020
- ↑ Environmental Clearance, January 2019
- ↑ 5.0 5.1 Integrated Lakhanpur-Belpahar-Lilari Opencast Project Details, Ministry of Environment Forest and Climate Change Government of India, Accessed June 2023.
- ↑ Mahanadi Coalfields Limited 2013-14 Annual Report, pp. 20-21.
- ↑ 7.0 7.1 7.2 for Prior Environmental Clearance for Coal Mining Project of Integrated Belpahar-Lakhanpur-Lilari Open Cast Project, MoEFCC, January 2019.
- ↑ Government of India, Ministry of Coal, Question No. 35 - "Opening of new Coal Mines", Archived from the original on 29 September 2022.
- ↑ 9.0 9.1 9.2 Half Yearly Report on Environmental Clearance Condition, Half Year Ending APR-2019 to SEPT-2019 - Lilari Opencast Project Lakhanpur Area, MoEFCC, Accessed June 2023.
- ↑ Coal Directory of India 2012-13, Ministry of Coal, 2014, p. 2.11.