Search results

From Global Energy Monitor
Results 1 – 20 of 93
Advanced search

Search in namespaces:

  • Nigeria-Morocco Gas Pipeline (category Proposed pipelines in Spain)
    m/year Length: 5,660 km Status: Proposed Start year: 2046 Cost: US$25 billion The Nigeria-Morocco Gas Pipeline was proposed in a December 2016 agreement between
    15 KB (2,475 words) - 20:42, 5 May 2025
  • Guitiriz-Zamora-Adradas Gas Pipeline (category Proposed pipelines in Spain) (section Pipeline Details)
    Guitiriz-Zamora-Adradas Gas Pipeline is a proposed gas pipeline in Spain. The pipeline would run from Guitiriz to Adradas in Spain, passing through Lugo, Villafranca
    6 KB (807 words) - 14:52, 30 June 2022
  • Extremadura Pipeline (category Proposed pipelines in Spain)
    Extremadura Pipeline is a cancelled oil pipeline in Spain. The Extremadura Pipeline would have run from Balboa, Spain to Huelva, Spain. Loading map...
    3 KB (460 words) - 20:56, 4 December 2024
  • Cantanhede-Mangualde Gas Pipeline (category Proposed pipelines in Spain) (section Pipeline Details)
    Cantanhede-Mangualde Gas Pipeline was a proposed gas pipeline in Portugal. The project was cancelled in 2020. The pipeline would run from Cantanhede to Mangualde in Portugal
    5 KB (544 words) - 20:04, 4 December 2024
  • Midi-Catalonia Pipeline (category Proposed pipelines in the Spain) (section Midi-Catalonia Pipeline)
    gas and, in the future, green hydrogen, as part of a plan to make Spain a hydrogen hub. MidCat compromises of sections in both France and Spain. The map
    13 KB (1,886 words) - 19:35, 4 December 2024
  • Hydrogen Interconnector Spain-Portugal was a proposed hydrogen pipeline in Spain and Portugal. It is currently considered cancelled, because it was rebranded
    8 KB (969 words) - 14:54, 26 January 2024
  • South Transit Eastern Pyrenees (STEP) Gas Pipeline (category Existing pipelines in Spain) (section Pipeline Details)
    Pyrenees (STEP) Gas Pipeline was a proposed gas pipeline in Spain and France. In January 2019, the regulating bodies of France and Spain officially rejected
    3 KB (360 words) - 11:05, 30 April 2021
  • Spain-Portugal Interconnector Gas Pipeline (category Existing pipelines in Spain)
    Spain-Portugal Interconnector Gas Pipeline was a proposed gas pipeline in Spain running to the Portuguese border. The project was cancelled in 2020. The
    5 KB (557 words) - 19:28, 4 December 2024
  • Spain-France East Interconnector (category Existing pipelines in Country A)
    Spain-France East Interconnector was a proposed gas pipeline between Spain and France. As of 2022 it is considered shelved. The pipeline is proposed to
    3 KB (419 words) - 20:16, 21 February 2023
  • H2 Larrau (category Gas and Hydrogen Pipelines)
    H2 Larrau is a proposed hydrogen pipeline in Spain. The pipeline is proposed to run from Villar de Arnedo, Spain to Larrau, Spain. Operator: Enagas Owner:
    1 KB (127 words) - 19:16, 4 December 2024
  • H2 Irún (category Gas and Hydrogen Pipelines)
    H2 Irún is a proposed hydrogen pipeline in Spain. The pipeline is proposed to run from Irun, Spain to Eibar, Spain. Operator: Enagas Owner: Parent company:
    1 KB (125 words) - 19:31, 4 December 2024
  • Green Hysland Pipeline (category Existing pipelines in Country A)
    Hysland Pipeline is a proposed gas pipeline in Spain. The pipeline is proposed to run from Cas Tresorer compressor station in Spain to Losetta, Spain. Loading
    4 KB (509 words) - 19:16, 4 December 2024
  • EastMed Gas Pipeline (category Proposed pipelines in Cyprus)
    EastMed Gas Pipeline, sometimes written as East Med Pipeline or Eastern Mediterranean Pipeline, is a proposed gas pipeline in Cyprus, Israel, and Greece
    22 KB (3,090 words) - 19:33, 4 December 2024
  • refined product pipelines. Key oil pipelines include the Ocensa, Llanos, Colombia, Caño Limón-Coveñas and Bicentenario pipelines. Pipelines were targeted
    51 KB (4,835 words) - 17:55, 18 January 2023
  • MW, although proposed solar PV power stations would have a capacity of 150 MW or more. Driven by advances in technology and increases in manufacturing
    20 KB (2,815 words) - 11:03, 30 April 2021
  • was scrapped in October, 2011. Three more projects were delayed or cancelled in Norway, as were a further two in Denmark and one each in Germany, Finland
    62 KB (8,134 words) - 14:37, 18 June 2021
  • Gran Canaria LNG Terminal (category Proposed LNG terminals in Spain) (section Opposition to LNG terminals in Spain)
    Arinaga LNG Terminal, was a proposed LNG terminal in Spain's Canary Islands that is now cancelled. The terminal's proposed location was at Puerto de Arinaga
    10 KB (1,181 words) - 22:35, 18 June 2025
  • Mugardos LNG Terminal (category Proposed LNG terminals in Spain)
    liquefied natural gas (LNG) terminal in Galicia, Spain. The terminal is located in Mugardos, La Coruña, Galicia, Spain. Loading map... {"type":"SATELLITE"
    12 KB (1,444 words) - 18:49, 17 July 2025
  • Tenerife LNG Terminal (category Existing LNG terminals in Spain) (section Opposition to LNG terminals in Spain)
    Terminal, was a proposed liquefied natural gas (LNG) terminal in Santa Cruz de Tenerife, Spain, that is now cancelled. The LNG terminal was proposed to be located
    10 KB (1,209 words) - 22:35, 18 June 2025
  • Spanish Hydrogen Backbone (category Existing pipelines in Spain) (section Pipeline Details)
    Spanish Hydrogen Backbone is a proposed hydrogen/gas pipeline in Spain. This pipeline runs from the Benavente, Spain to Zaragoza, Spain. This new pipeline
    7 KB (740 words) - 19:50, 4 December 2024
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)