  • Krk FSRU (redirect from Hrvatska LNG Terminal) (category Proposed LNG terminals in Croatia)
    known as Hrvatska LNG and LNG Croatia) is an operating floating LNG terminal in Croatia. A Phase 2 expansion of the project is proposed. The map below shows
    23 KB (2,662 words) - 20:35, 14 September 2023
  • Adria LNG Terminal (category LNG terminals in Croatia)
    "icon":""}]} Adria LNG Terminal is a proposed liquefied natural gas (LNG) regasification terminal in Primorje, Croatia. The project was first proposed in 1995. A
    3 KB (389 words) - 21:08, 6 February 2023
  • and LNG terminals) was 1,677 million euros in 2022. Croatia had the 11th highest estimate cost of future gas transport infrastructure in the EU in 2022
    44 KB (4,018 words) - 17:13, 10 November 2022
  • The Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline is a proposed natural gas pipeline in Croatia and Bosnia and Herzegovina. The planned
    8 KB (1,145 words) - 18:03, 9 March 2023
  • sak-Kozarac-Slobodnica LNG main evacuation pipeline is a proposed natural gas pipeline system in Croatia which will be built in 3 phases. The pipeline
    13 KB (2,041 words) - 18:17, 8 July 2022
  • Druzhba Oil Pipeline (category Proposed pipelines in Croatia)
    pipeline is 1,490 km in Ukraine, 670 km in Poland, 130 km in Hungary, 332 km in Lithuania, 420 km in Latvia, and around 400 km in Slovakia and in the Czech Republic
    54 KB (8,031 words) - 16:23, 2 April 2024
  • Interconnector Croatia-Serbia (category Proposed pipelines in Croatia)
    Interconnector Croatia-Serbia is a proposed gas pipeline running from Croatia to Serbia. The pipeline runs from Slobodnica, Croatia through Sotin to Bačko
    8 KB (980 words) - 20:38, 13 July 2022
  • Croatia-Slovenia Interconnector Gas Pipeline (category Proposed pipelines in Hungary)
    Croatia-Slovenia Interconnector Gas Pipeline is a proposed pipeline in Croatia and Slovenia. The pipeline will run from Lučko, Croatia; to Zabok, Croatia;
    9 KB (1,194 words) - 15:37, 7 July 2022
  • Ionian Adriatic Gas Pipeline (category Proposed pipelines in Croatia)
    transmission system of Croatia. In addition, it may be connected with other new gas infrastructure, including the proposed Adria LNG terminal in Krk. The length
    14 KB (1,866 words) - 14:16, 5 February 2022
  • Pan-European Oil Pipeline (category Existing oil pipelines in Serbia, Croatia, Slovenia, Italy)
    Pipeline, was a proposed oil pipeline in Southern Europe and the Balkans. The pipeline would run from Constanţa in Romania via Serbia and Croatia to Rijeka,
    7 KB (842 words) - 04:42, 30 May 2022
  • Bosnia and Herzegovina–Croatia North Interconnector Gas Pipeline (category Existing pipelines in Bosnia and Herzegovina)
    running between Croatia and Bosnia and Herzegovina. The pipeline runs from Slavonski Brod (Slobodnica) in Croatia to Bosanski Brod in Bosnia and Herzegovina
    6 KB (770 words) - 19:48, 13 July 2022
  • South Stream Gas Pipeline (category Proposed pipelines in Croatia)
    der March in Austria. Another route would have continued through Gospođinci and Bački Breg also to Hungary with a branch line to Croatia. In Hungary it
    43 KB (4,355 words) - 19:03, 11 July 2022
  • Umag-Plovanija-Koper Gas Pipeline (category Proposed pipelines in the Croatia)
    (Kovri)-Koper pipeline, is a proposed gas pipeline in Croatia and Slovenia. The pipeline would run from Umag, Croatia to Plovanija, Croatia to Koper, Slovenia.
    2 KB (284 words) - 19:59, 13 July 2022
  • Városföld–Slobodnica pipeline (category Proposed pipelines in Croatia)
    "locations":[]} Operator: Plinacro (Croatia) and FGSZ Ltd. (Hungary) Owner: Plinacro (Croatia) and FGSZ Ltd. (Hungary) Parent: Plinacro (Croatia) and MOL Group. (Hungary)
    3 KB (689 words) - 18:18, 29 August 2022
  • Licka Jesenica-Trzac-Bosanska Krupa gas pipeline (category Proposed pipelines in Bosnia and Herzegovina)
    Bosnia and Herzegovina–Croatia West Interconnection Gas Pipeline and West Interconnection BiH/CRO, is a proposed gas pipeline in Croatia and Bosnia and Herzegovina
    6 KB (642 words) - 18:42, 6 February 2023
  • fossil gas in 2017, ranking 59th in the world. Romania exported 22.65 million cubic meters of fossil gas in 2017, ranking 53rd in the world. In 2012, all
    37 KB (3,410 words) - 17:05, 10 November 2022
  • fossil gas in 2019, ranking 8th in the European Union. Greece imported 4.984 bcm of fossil gas in 2017, ranking 36th in the European Union. In 2020, fossil
    37 KB (3,535 words) - 17:10, 10 November 2022
  • pipeline transport projects in development were: As of 2021, there was one operating LNG terminal (Świnoujście Polskie LNG Terminal) in Poland and at least 6
    33 KB (3,297 words) - 18:12, 10 November 2022
  • Pass, Gela, Melendugno and Gorizia), and three LNG terminals (Adriatic LNG Terminal, Panigaglia LNG Terminal and Toscana FSRU). 90 percent of imports come
    37 KB (3,602 words) - 17:08, 10 November 2022
  • Transalpine Oil Pipeline (category Existing oil pipelines in Italy)
    by Bechtel in 1963. The pipeline was commissioned in 1967, at a cost of around US$ 192 million. The pipeline starts from the marine terminal in Trieste.
    7 KB (914 words) - 19:00, 24 March 2023