Camiri-Yacuiba Oil Pipeline
From Global Energy Monitor
[español]
Camiri-Yacuiba Oil Pipeline (also known as OCY-1) is an operating oil pipeline in Bolivia.[1]
Location
The pipeline starts in Camiri and runs to Yacuiba, Bolivia.[1]
Project Details
- Operator: YPFB Transporte SA[2]
- Parent company: Yacimientos Petrolíferos Fiscales Bolivianos (YPFB) 98.55%, Others 1.44%[3]
- Capacity: 9.8 MMcf/d[4]
- Length: 261 km / 162 miles[1]
- Diameter: 6.6 inches[4]
- Status: Operating[2]
- Start Year: 2001[4]
- Cost:
- Financing:
Articles and resources
References
- ↑ 1.0 1.1 1.2 "Sistema de Transporte por Oleoductos" (PDF). Agencia Nacional de Hidrocarburos.
- ↑ 2.0 2.1 "Sistemas de Transporte de Hidrocarburos Líquidos - YPFB Transporte". YPFB Transporte (in español). Retrieved 2021-05-26.
- ↑ "¿Quiénes Somos? - YPFB Transporte". YPFB Transporte (in español). Retrieved 2021-05-26.
- ↑ 4.0 4.1 4.2 "Bolivia Red de Oleoductos" (PDF). Oil Production. June 2005.